New Targets identified at Carr Boyd
Released
Released
Announcement PDF
ASX:ESR
4 October 2023
Carr Boyd TargetEM Survey Identifies Multiple
New Bedrock Anomalies
HIGHLIGHTS
➔ Next-generation helicopter-borne TargetEM system has identified multiple first and second order
bedrock conductor anomalies at Carr Boyd (Figure 1)
➔ High-priority Colreavy Komatiite shows bedrock conductivity over a 5km strike length
➔ Previously unknown 3km long southern bedrock conductor lies under shallow cover warrants immediate
investigation
➔ Known mineralisation at T5, Carr Boyd and Broonhill responded well to TargetEM
➔ The majority of bedrock anomalism identified correspond to internal and external basal contact positions
identified in the 2023 exploration review
➔ PoW to drill Colreavy approved with activities ready to commence
Figure 1: First and second order bedrock anomalism identified by the recent TargetEM survey at Carr Boyd
_________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce the successful
preliminary results obtained by the recent TargetEM survey1 at its 100% owned Carr Boyd Nickel Project
located 80km north of Kalgoorlie-Boulder in Western Australia.
Multiple first and second order bedrock-conductor anomalies have been identified including over a 5km
strike length of the Colreavy Komatiite and a new 3km linear zone under cover to the south of the Carr
Boyd Intrusion.
Commenting on the highly anticipated results, Estrella Managing Director Chris Daws said:
“We are thrilled to be able to present the initial results from the deployment of the TargetEM system, which
is an extremely advanced helicopter-borne electromagnetic survey.
“The survey was run across 253km2 of our Carr Boyd tenure and has revealed a number of exciting
anomalies. Firstly, the survey has highlighted a series of primary bedrock anomalies which coincide with the
Carr Boyd mine and T5 Discovery, as well as a secondary bedrock anomaly at Broonhill. The interpretation
of anomalies at the locations of primary sulphides increases our confidence in the technology.
“Secondly – and arguably even more exciting – are the newly interpreted targets which occur at locations yet
to be drilled. Major bedrock anomalies have been identified at the Colreavy Komatiite, as well as a new
southern conductor which is currently largely under cover.
“These are fantastic opportunities to make discoveries and the approval of a PoW for our first ever drilling
campaign at Colreavy will see us ready to get underway. Meanwhile, the strength of the new southern
conductor elevates this prospect to a primary target and the Company will immediately accelerate plans to
drill at this location.
“While further data from the survey will filter through, the initial results are very encouraging and are yet
another example of Estrella Resources using advanced research and technology to make discoveries.”
The TargetEM system contains many structural, electrical, and software improvements over previous
helicopter-borne EM systems that have greatly improved the sensitivity and depth of investigation.
The resulting bedrock anomalism identified by the system correctly located known nickel-copper-sulphide
mineralisation at T5, Carr Boyd and Broonhill. There is no real difference between first and second order
anomalies save for second order anomalies have surface effects which partially mask the anomaly.
The electromagnetic response from zones of known stringer sulphide such as at Tregurtha and POH can
be seen in the data, however more processing is needed to isolate those true anomalies from other potential
ground effects, enabling new but more subtle anomalies to be identified. Processing of the data by Expert
Geophysics and Southern Geoscience will be ongoing.
On-ground investigation of the anomalies reveal that many of them relate to areas of interest identified by
the recent exploration review, which combined multiple data-sets with research conducted by the CSIRO
in 2022. The resulting internal and external basal contact positions (Figure 2) show some correlation to the
identified anomalism and further refinement of the exploration model and targeting can now take place.
1 See ASX Announcements dated: 9th & 21st August 2023
Figure 2: Recently proposed internal and external prospective contacts at the Carr Boyd Nickel Project
Colreavy Komatiite
The anomalism at Colreavy extends over a 5km strike length and appears directly related to the Komatiite
magnetics. The area is under clay cover and so the geology is not visible at surface. There has been no
modern exploration over the 16km strike at Colreavy and historical drilling of the komatiite has been largely
limited to the north and south ends of the structure. Only one hole has tested the area within the prospective
5km long zone of anomalism identified by TargetEM. This drillhole (DD97CB029) intersected a complexly
layered zone of komatiite interfingered with felsic-pyritic sediments. The geology shows Colreavy has the
right paleo-environment required to form a Kambalda-style nickel deposit.
Estrella has previously identified this area as one of the highest exploration priorities. A Program of Works
to drill Colreavy has now been granted and flora surveys have recently been conducted ahead of gaining
clearing permits to set up for drilling.
New Southern Conductor
The recent survey has identified a 3.3km long bedrock conductor striking west-northwest to the south of
the Carr Boyd layered intrusion.
Ground-mapping has revealed a mixed sequence of mafic sediments, intrusive pyroxene-cumulate sills
and basalts. The trend contains a co-incident gold anomaly related to the Whitehead’s gold trend that
extends from Gindalbie some 25km to the south.
Gossanous sulphide bleed can be found at surface (Figure 3) with elevated copper and arsenic. CBDD081
drilled by Estrella in 2022 intersected up to 0.5g/t Au in a sulphidic shear zone some 850m to the north
whilst targeting the Gossan Hill Prospect.
Due to the cover, the exact source of the bedrock anomaly remains obscured and requires drilling. A PoW
has been submitted to gain exploration drill access to the area.
Figure 3: Copper-rich sulphide and pyroxene-cumulate rocks in the vicinity of the new southern EM bedrock anomaly
T5 and Carr Boyd
The TargetEM survey correctly identified the T5 mineralisation discovered by Estrella’s discovery RC hole
CBP042 and also saw distinct responses from the remnant Carr Boyd mineralisation.
These two resources have been extensively drilled to depth however confirmation that the TargetEM
system could detect, particularly the T5 mineralisation which has remained undiscovered for over 50 years,
gives the Company confidence in the system and in the additional bedrock signatures identified elsewhere
across the project.
Northern Carr Boyd Intrusion
Several bedrock anomalies to the northern end of the intrusion have been identified which correlate to the
main basal contact, one at Broonhill and another some 1.5km to the northeast at the Dunn Prospect.
Estrella’s diamond drilling identified Ni-Cu-S at Broonhill but has not tested the basal contact to the
northeast at Dunn.
In addition, two conductors related to internal basal contacts were identified. The first and largest lies
immediately north of Carr Boyd and east of T5 and relates to the Mossgiel internal contact depicted as #5
target horizon in Figure 2. Gossanous float has been mapped by Estrella along this contact however to
date the focus on exploration has been the main basal contact and thus far this internal horizon remains
untested by drilling.
An additional internal anomaly lies some way east of the Porphyry Hill horizon at a prospect historically
named Tektite Hill. The Tektite Hill contact lies within the layered gabbroic sequences mid-way through the
complex and surface geology is obscured.
Figure 4: Northern side of the Carr Boyd Intrusion
The stringer mineralisation located by historical drilling at POH and at Frost did not show significant
anomalism in the initial anomaly identification process and work will continue on these zones so other areas
containing similar mineralisation can be accurately assessed.
Other Areas
Additional anomalies were identified along the Gossan Hill internal contact (#7 in Figure 2), the southern
end of the POH internal contact (#8 in Figure 2) and within and below the Eastern Pyroxenite basal contact
(#3 in Figure 2) and the Frenchman’s Hill basal contact (#2 in Figure 2). These anomalies all lie below
shallow cover and require drilling to provide geological context which cannot be gained by surface
inspection.
Next Steps
Further processing and refinement of the TargetEM and Audio-Frequency-Magnetic time-domain (AFMAG)
data will continue to enable more subtle anomalism to be drawn out of the data.
The Company has most of the regulatory approvals in place to commence drilling and has submitted
additional approvals to explore outlying areas such as the Eastern Pyroxenite.
Additional target ranking and budgeting has commenced so that an un-interrupted work program going
forward can be commenced.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of Geoscientists. Mr.
Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to
the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner consents to the inclusion in the
report of the matters based on their information in the form and context in which it appears.
Forward Looking Statements
This announcement contains certain forward looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
APPENDIX 1 JORC TABLE 1 – CARR BOYD EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry
standard
measurement
tools
appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld
XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of
sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Drilling
techniques
•
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
Drill sample
recovery
•
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
•
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
•
•
•
Logging
•
•
•
Sub-sampling
techniques
•
If core, whether cut or sawn and whether
quarter, half or all core taken.
Commentary
•
ESR drilling included diamond core - half core
samples with a maximum of 2m and minimum
0.25m length. DD core samples have been
half cut with an automatic core saw.
•
Core is cut and sampled to ensure the sample
is representative and no bias is introduced.
Cutting of specific, banded or stringer
sulphide zoned core is done orthogonal to the
banding to ensure there is no bias.
•
Determination of mineralisation has been
based on geological logging, visual sulphide
estimates and confirmation using a pXRF
machine. Samples were dispatched to an
accredited laboratory for multi-element
analysis.
•
Diamond core drilling was used to obtain 6m
length samples from the core barrel which are
then marked in one metre intervals, based on
core block measurements and core recovery.
•
Samples are selected based on geological
logging boundaries or on nominal meter
marks. Collected samples weigh a nominal 23 kg (depending on sample length). Samples
have been dispatched to an accredited
commercial laboratory in Perth for analysis.
•
Samples are being analysed using a 4-acid
digest, ME- ICP for 33 elements and all
samples are also being tested for Au & PGE
elements using ICP analysis.
•
Drilling was undertaken using NQ2 sized drill
core.
•
Holes have been collared with mud rotary
from surface, HQ rough cored to top of fresh
rock then NQ2 cored to EOH.
•
•
•
•
•
•
•
•
Core recovery was recorded by the field crew
and verified by the geologist.
RQD measurements were digitally recorded to
ensure recovery details were captured.
Sample recovery in all mineralised zones is
high with negligible core loss observed.
Diamond core drilling is the highest standard
and no relationship has been established
between sample recovery and reported grade
as the core is in very good condition.
Detailed industry standard of collecting core
in core trays, marking metre intervals and
drawing core orientation lines were
undertaken.
Core trays were photographed wet and dry
prior to sampling.
Prior to 2021 drill hole logs were recorded in
Excel spread sheets and validated in
Micromine
Software
as the
drilling
progressed.
In 2021 a digital logging system, Logchief,
was implemented which validates data as it is
recorded and uploads that data remotely to a
centralised database.
The entire length of all holes are logged.
Core is half cut using an automatic core saw
to achieve a half-core sample for laboratory
submission.
The
sample
preparation
_________________________________________________________________________________
Criteria
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification of
sampling and
assaying
JORC Code explanation
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Commentary
technique is considered industry best
standard practice.
•
No field duplicates have been collected for
DD holes. Field duplicates will be collected
once initial results are returned and
resampling of the mineralised zones is
warranted.
•
Sample sizes are appropriate to the grain size
of the mineralisation.
•
•
•
•
•
Location of
data points
•
•
•
Data spacing
and
distribution
•
•
•
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
•
•
•
•
•
•
•
Prior to 2021 drill hole logs were recorded in
Excel spread sheets and validated in
Micromine
Software
as
the
drilling
progressed.
In 2021 a digital logging system, Logchief,
was implemented which validates data as it is
recorded and uploads that data remotely to a
centralised database hosted by Maxgeo.
Hole CBDD028 is twinning hole CBP042. No
other twinning is warranted at this stage.
•
No adjustments
undertaken.
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
•
For drill collars, RC and DD holes were
surveyed with DGPS equipment using the
MGA94, Zone 51 coordinate system. Mineral
Resource estimation was carried out on this
grid.
Topography is relatively flat and control is
more than adequate given the early stage of
the project. A 3D drone ortho-photographic
survey has been used to create a DTM of the
project area.
Drill data spacing of all drill data is sufficient
to establish the degree of geological and
grade continuity appropriate for estimating a
Mineral Resource.
Drill hole spacing ranges from 10m by 10m in
the most well-drilled portion of the deposit and
broadens to approximately 40m by 80m over
the remaining areas. Spacing is adequate to
establish the degree of geological and grade
continuity for estimating a Mineral Resource.
Samples were composited to 1m lengths prior
to Mineral Resource estimation.
The geometry of drill holes relative to the
mineralised zones achieves unbiased
sampling of this deposit type.
No orientation-based sampling bias has been
identified.
•
•
•
Orientation of
data in
relation to
geological
structure
Samples are selected based on geological
logging boundaries or on nominal meter
marks. Collected samples weigh a nominal 23 kg (depending on sample length). Samples
have been dispatched to an accredited
commercial laboratory in Perth for analysis.
Samples are being analysed at Intertek and
ALS Laboratories in Perth using a 4-acid
digest, ME- ICP for 33 elements and all
samples are also being tested for Au & PGE
elements using ICP analysis.
For ESR drilling, QAQC included Certified
Reference Material (CRM’s) and blank
(Blanks) samples inserted at the laboratory.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
•
•
to
assay
data
were
Criteria
Sample
security
Audits or
reviews
JORC Code explanation
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• The measures taken to ensure sample security.
Commentary
•
•
The results of any audits or reviews of sampling
techniques and data.
•
Samples are in the possession of ESR
personnel from field collection to laboratory
submission in Kalgoorlie.
No independent audit or review has been
undertaken.
Section 2 - Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a license to operate in the area.
• Acknowledgment and appraisal of exploration
by other parties.
Commentary
•
Carr Boyd Nickel Pty Ltd (a wholly owned
subsidiary of ESR) holds a 100% interest in
the nickel and base metal rights to the project.
•
All of the tenements are current and in good
standing.
•
•
•
•
•
•
•
•
•
•
The Carr Boyd Rocks deposit was discovered
by Great Boulder Mines, in a joint venture with
North Kalgurli Ltd in 1968. The deposit was
mined between 1972 and 1975, during which
time they explored for additional breccia pipe
occurrences near the mine.
WMC acquired Great Boulder Mines Ltd in
1975, briefly reopening the mine in 1977
before closing it permanently shortly
thereafter due to a collapse in the nickel price.
The mine had produced 210,000t at 1.44% Ni
and 0.46% Cu before its closure.
From 1968 Pacminex Pty Ltd held most of the
ground over the CBLC outside of the
immediate mine area.
Between 1968 and 1971 they conducted
extensive exploration programs searching for
large basal contact
and/or stratabound Ni-Cu deposits. It was
during this time that most of the disseminated
and cloud sulphide occurrences such as
those at Tregurtha, West Tregurtha and
Gossan Hill were discovered.
Defiance Mining acquired the regional
tenements from Pacminex in 1987 and
focused on exploration for PGE deposits
between 1987 and 1990. In 1990 Defiance
purchased the Carr Boyd Rocks mine from
WMC and switched focus to the mine area
between 1990 and 2001, leaving many PGE
targets untested.
From 1990 Defiance dewatered the mine to
conduct testwork and feasibility studies on
the remnant mineralisation. Metallurgical
testwork, Mineral Resource estimations, and
scoping studies were completed. Around
1996 the focus shifted again to regional
exploration for large tonnage basal contact
deposits.
In 2001 Titan Resources Ltd (Titan) acquired
the project and recommenced economic
evaluations of the remnant material at Carr
Boyd Rocks before embarking on another
regional exploration program focusing on the
basal contact.
An aeromagnetic survey,
airborne EM reprocessing, and several
programs of RAB and RC drilling were
completed.
From 2005 Yilgarn Mining entered a JV with
Titan and continued with some regional
exploration but focused most attention in and
around the Carr Boyd Rocks mine.
In 2007 Titan was acquired by Consolidated
Minerals Ltd (Consmin). Consmin conducted
IP surveys and detailed gravity surveys but
did not drill any targets before selling the
project to Salt Lake Mining (SLM) in 2013.
SLM completed limited drilling to meet
expenditure commitments, before selling the
project to Apollo Phoenix Resources in 2016.
Criteria
JORC Code explanation
Geology
•
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Data
aggregation
methods
Deposit type, geological setting and style of
mineralisation.
Commentary
•
Apollo sold the project to ESR in 2018.
•
The Project lies within the Achaean Yilgarn
Craton in a 700km belt of elongate deformed
and folded mafic, ultramafic rocks and
volcanic sediments intruded by granitoids
which is referred to as the Norseman-Wiluna
Belt. The belt has been divided into several
geological distinct terranes, with the project
area lying at the northern end of the Gindalbie
terrane (Swager, 1996). The geology of the
Carr Boyd area is dominated by the Carr
Boyd mafic-ultramafic intrusive complex
(“CBIC”).
•
Several distinctive styles of Ni and Ni-Cu
mineralisation have been identified within the
CBIC. At the Carr Boyd Rocks Nickel Mine NiCu mineralisation is hosted within several 20
to 60m diameter brecciated pipe-like bodies
that appear to be discordant to the magmatic
stratigraphy. Mineralisation is hosted by a
matrix of sulphides (pyrrhotite, pentlandite,
pyrite and chalcopyrite) within brecciated
bronzite and altered country rock clasts.
•
Stratiform Ni-Cu-PGE mineralisation has
been identified at several different locations
within the layered magmatic complex.
•
ESR is in the process of re-mapping and
reclassifying the Carr Boyd Igneous
Complex. Previous “Layered Intrusive”
models are misleading as the complex is
made up of many overprinted and
juxtaposed, smaller layered and non-layered
intrusives that have progressed from
ultramafic to mafic over time. The complex is
better described as a magma feeder zone,
where the earliest melts passing through the
Morelands Formation have assimilated
graphitic sulphidic shales, reached sulphur
saturation and deposited nickel sulphides
along basal contacts.
•
These basal contacts are not restricted to the
base of the complex, but can form within the
complex, wherever access was gained by
these earlier flows.
•
The complex has then been intruded and
inflated over time by progressively more
mafic, barren magmas to produce what we
see today.
• Exploration results with all relevant drillhole
information are reported in the body of the
text.
• All drill hole information relevant to this
resource report/statement has been included
in the appendices. No relevant drill hole
information has been excluded.
•
•
Exploration results with all relevant drillhole
information are reported in the body of the
text.
Significant Grade Intersections are reported on
a 0.5% Ni cut-off
Criteria
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
Reporting
Other
substantive
exploration
data
Further work
JORC Code explanation
• Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for
such aggregation should be stated and some
typical examples of such aggregations should
be shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘down hole length, true width
not known’).
Commentary
• Composite assay grades are determined by
geology and nickel-copper-sulphur content.
• Assays are length and SG weighted when
calculating
average
grades
over
an
intersection.
• Metal equivalent values have not been used.
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be included
for any significant discovery being reported.
These should include, but not be limited to a
plan view of drill hole collar locations and
appropriate sectional views.
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples - size and method of treatment;
metallurgical test results; bulk density,
groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating substances.
•
Relevant diagrams have been included within
the Mineral Resource report main body of
text.
•
All new drillhole information within this
announcement is reported
•
•
•
•
Share your feedback
Discover