Next-Generation Geophysical Program to Commence at Carr Boyd
HIGHLIGHTS
➔ Next-generation helicopter-borne TargetEM system to be deployed at Carr Boyd by Expert Geophysics
➔ TargetEM offers significant technology and sensitivity upgrades from previous airborne systems
➔ World-first Audio-Frequency-Magnetic (AFMAG) time-domain data to be collected will vastly improve
depth and quality of investigation in potentially detecting drill targets over previous systems
➔ 253km2 survey targets entire Carr Boyd internal and basal contacts along with the nearby Colreavy
Komatiite
Figure 1: Location of the next-generation TargetEM survey with respect to Estrella’s tenements
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce the signing of
an agreement with Canadian-based geophysical firm Expert Geophysics to commence a world-first
helicopter-borne electromagnetic survey (TargetEM) at the Company’s Carr Boyd Project, approximately
80km NNW of Kalgoorlie in Western Australia.
_________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
ACN 151 155 207
The 253km2 survey will target all of Estrella’s tenure at Carr Boyd as shown in Figure 1, encompassing all
prospective horizons identified in the recent exploration review including the high priority Colreavy Komatiite
target which has had no previous modern geophysics undertaken.
Commenting on the highly anticipated program, Estrella Managing Director Chris Daws said:
“I am extremely pleased and excited to be able to inform shareholders that we will be advancing exploration
efforts at our 100% owned Carr Boyd Ni/Cu/PGE project.
We have always looked to improve our discovery advantage utilising ultra-modern exploration techniques
and technology. We were the first to successfully use the revolutionary e-vibe seismic system in W.A. and
our team is now employing a world-first in geophysical surveying methods. This is next-gen geophysical
system technology that even the majors have not yet utilised.
The geophysical survey will cover our entire tenement package at Carr Boyd, some 253km 2, so that we can
potentially locate drill targets that have previously evaded detection with older technology. The program will
be funded through the recent equity provided by Radium Capital.
I look forward to reporting the results as we continue to unlock Carr Boyd’s geological secrets.”
The R&D personnel at Expert Geophysics were the developers behind the highly successful and award
winning VTEM, ZTEM and Air-MT systems. The TargetEM system contains many structural, electrical, and
software improvements over previous helicopter-borne EM systems that have greatly improved the
sensitivity and depth of investigation. Estrella will host the first fully commercial deployment of the system
at Carr Boyd in July 2023.
In addition to airborne time-domain low-noise electromagnetic data, the Company will be acquiring VLF,
magnetics and high-frequency AFMAG data. AFMAG acquired on a time-domain system, has never been
released commercially. The system and software have been in development and testing for several years;
however, Expert Geophysics now wishes to exploit it more widely and is now making it available in Australia.
AFMAG technology utilizes naturally occurring electromagnetic fields in the audio-frequency range, which
are associated with global lighting discharges. Thunderstorms release energy converted to electromagnetic
fields that propagate through the ionosphere-Earth interspace. The electromagnetic fields and currents
induced by these fields in the subsurface are used in the combined system to understand differentiation in
the electrical resistivity of the subsurface.
The advantages of the AFMAG data with respect to Estrella’s Carr Boyd exploration program include:
1. The AFMAG complementary data will allow the system to measure across a broader range of
resistivities than any other time-domain system on the market, revealing a more significant
distinction of geology and structure at depth. The system can also resolve highly resistive targets.
With the seismic data already collected, this will enable true 3-dimensional geological
interpretation, which can be used to constrain internal exploration windows and model prospective
horizons within the Carr Boyd igneous complex (Figure 1) before drilling.
2. In the case of nickel-copper-PGE type targets, the system can detect "superconducting type
massive sulphides”, which are problematic for other time-domain systems, along with significant
alteration zones followed by disseminated sulphides.
3. The new system’s capability will also enable recognition of superparamagnetic (SPM) anomalies
and compensate for induced polarization (IP) effects which is an issue for other airborne timedomain systems (especially prominent in Australia). These effects create pseudo anomalies and
mask the useful inductive EM response. The most intensive IP effects exist in areas of volcanicsedimentary rocks and surficial clay deposits covering parent rocks. This is common across the
Goldfields and applies to the Carr Boyd basal contact and the Colreavy Komatiite.
4. AFMAG data measured at the lowest possible frequencies will allow the system to see deeper than
any airborne time-domain system. This will be especially useful at Carr Boyd where the basal
contacts dip steeply (Figure 2).
Figure 2: Depth of investigation of the AFMAG system with respect to traditional airborne EM and the known
mineralisation at Carr Boyd
The 2023 exploration review collated all previous geophysics survey results gained either on-ground or via
aircraft from the 1980’s until present. Anomalies in the data over Carr Boyd exist, however each technique
has its limitations and nothing definitive was ever identified or adequately tested, including the T5 discovery
made by Estrella.
The TargetEM system with the additional AFMAG acquisition gives Estrella the opportunity to update the
Carr Boyd conductivity and magnetic models and to incorporate the seismic interpretation along with the
recent findings of the collaboration with the CSIRO.
The TargetEM system (Figure 3) will be available in July 2023 and Estrella very much looks forward to
working with Expert Geophysics in Australia.
Figure 3: The TargetEM loop under testing
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of Geoscientists. Mr.
Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to
the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner consents to the inclusion in the
report of the matters based on their information in the form and context in which it appears.
Forward Looking Statements
This announcement contains certain forward looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
APPENDIX 1 JORC TABLE 1 – CARR BOYD EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry
standard
measurement
tools
appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld
XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of
sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Drilling
techniques
•
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
Drill sample
recovery
•
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
•
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
•
•
•
Logging
•
•
•
Sub-sampling
techniques
•
If core, whether cut or sawn and whether
quarter, half or all core taken.
•
If non-core, whether riffled, tube sampled,
Commentary
•
ESR drilling included diamond core - half core
samples with a maximum of 2m and minimum
0.25m length. DD core samples have been
half cut with an automatic core saw.
•
Core is cut and sampled to ensure the sample
is representative and no bias is introduced.
Cutting of specific, banded or stringer
sulphide zoned core is done orthogonal to the
banding to ensure there is no bias.
•
Determination of mineralisation has been
based on geological logging, visual sulphide
estimates and confirmation using a pXRF
machine. Samples were dispatched to an
accredited laboratory for multi-element
analysis.
•
Diamond core drilling was used to obtain 6m
length samples from the core barrel which are
then marked in one metre intervals, based on
core block measurements and core recovery.
•
Samples are selected based on geological
logging boundaries or on nominal meter
marks. Collected samples weigh a nominal 23 kg (depending on sample length). Samples
have been dispatched to an accredited
commercial laboratory in Perth for analysis.
•
Samples are being analysed using a 4-acid
digest, ME- ICP for 33 elements and all
samples are also being tested for Au & PGE
elements using ICP analysis.
•
Drilling was undertaken using NQ2 sized drill
core.
•
Holes have been collared with mud rotary
from surface, HQ rough cored to top of fresh
rock then NQ2 cored to EOH.
•
•
•
•
•
•
•
•
Core recovery was recorded by the field crew
and verified by the geologist.
RQD measurements were digitally recorded to
ensure recovery details were captured.
Sample recovery in all mineralised zones is
high with negligible core loss observed.
Diamond core drilling is the highest standard
and no relationship has been established
between sample recovery and reported grade
as the core is in very good condition.
Detailed industry standard of collecting core
in core trays, marking metre intervals and
drawing core orientation lines were
undertaken.
Core trays were photographed wet and dry
prior to sampling.
Prior to 2021 drill hole logs were recorded in
Excel spread sheets and validated in
Micromine
Software
as the
drilling
progressed.
In 2021 a digital logging system, Logchief,
was implemented which validates data as it is
recorded and uploads that data remotely to a
centralised database.
The entire length of all holes are logged.
Core is half cut using an automatic core saw
to achieve a half-core sample for laboratory
submission.
The
sample
preparation
_________________________________________________________________________________
Criteria
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification of
sampling and
assaying
JORC Code explanation
rotary split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Commentary
technique is considered industry best
standard practice.
•
No field duplicates have been collected for
DD holes. Field duplicates will be collected
once initial results are returned and
resampling of the mineralised zones is
warranted.
•
Sample sizes are appropriate to the grain size
of the mineralisation.
•
•
•
•
•
Location of
data points
•
•
•
Data spacing
and
distribution
•
•
•
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
•
•
•
•
•
•
•
Prior to 2021 drill hole logs were recorded in
Excel spread sheets and validated in
Micromine
Software
as
the
drilling
progressed.
In 2021 a digital logging system, Logchief,
was implemented which validates data as it is
recorded and uploads that data remotely to a
centralised database hosted by Maxgeo.
Hole CBDD028 is twinning hole CBP042. No
other twinning is warranted at this stage.
•
No adjustments
undertaken.
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
•
For drill collars, RC and DD holes were
surveyed with DGPS equipment using the
MGA94, Zone 51 coordinate system. Mineral
Resource estimation was carried out on this
grid.
Topography is relatively flat and control is
more than adequate given the early stage of
the project. A 3D drone ortho-photographic
survey has been used to create a DTM of the
project area.
Drill data spacing of all drill data is sufficient
to establish the degree of geological and
grade continuity appropriate for estimating a
Mineral Resource.
Drill hole spacing ranges from 10m by 10m in
the most well-drilled portion of the deposit and
broadens to approximately 40m by 80m over
the remaining areas. Spacing is adequate to
establish the degree of geological and grade
continuity for estimating a Mineral Resource.
Samples were composited to 1m lengths prior
to Mineral Resource estimation.
The geometry of drill holes relative to the
mineralised zones achieves unbiased
sampling of this deposit type.
No orientation-based sampling bias has been
identified.
•
•
•
Orientation of
data in
relation to
geological
structure
Samples are selected based on geological
logging boundaries or on nominal meter
marks. Collected samples weigh a nominal 23 kg (depending on sample length). Samples
have been dispatched to an accredited
commercial laboratory in Perth for analysis.
Samples are being analysed at Intertek and
ALS Laboratories in Perth using a 4-acid
digest, ME- ICP for 33 elements and all
samples are also being tested for Au & PGE
elements using ICP analysis.
For ESR drilling, QAQC included Certified
Reference Material (CRM’s) and blank
(Blanks) samples inserted at the laboratory.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
orientation and the orientation of key
•
•
to
assay
data
were
Criteria
Sample
security
Audits or
reviews
JORC Code explanation
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• The measures taken to ensure sample security.
Commentary
•
•
The results of any audits or reviews of sampling
techniques and data.
•
Samples are in the possession of ESR
personnel from field collection to laboratory
submission in Kalgoorlie.
No independent audit or review has been
undertaken.
Section 2 - Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a license to operate in the area.
• Acknowledgment and appraisal of exploration
by other parties.
Commentary
•
Carr Boyd Nickel Pty Ltd (a wholly owned
subsidiary of ESR) holds a 100% interest in
the nickel and base metal rights to the project.
•
All of the tenements are current and in good
standing.
•
•
•
•
•
•
•
•
•
•
The Carr Boyd Rocks deposit was discovered
by Great Boulder Mines, in a joint venture with
North Kalgurli Ltd in 1968. The deposit was
mined between 1972 and 1975, during which
time they explored for additional breccia pipe
occurrences near the mine.
WMC acquired Great Boulder Mines Ltd in
1975, briefly reopening the mine in 1977
before closing it permanently shortly
thereafter due to a collapse in the nickel price.
The mine had produced 210,000t at 1.44% Ni
and 0.46% Cu before its closure.
From 1968 Pacminex Pty Ltd held most of the
ground over the CBLC outside of the
immediate mine area.
Between 1968 and 1971 they conducted
extensive exploration programs searching for
large basal contact
and/or stratabound Ni-Cu deposits. It was
during this time that most of the disseminated
and cloud sulphide occurrences such as
those at Tregurtha, West Tregurtha and
Gossan Hill were discovered.
Defiance Mining acquired the regional
tenements from Pacminex in 1987 and
focused on exploration for PGE deposits
between 1987 and 1990. In 1990 Defiance
purchased the Carr Boyd Rocks mine from
WMC and switched focus to the mine area
between 1990 and 2001, leaving many PGE
targets untested.
From 1990 Defiance dewatered the mine to
conduct testwork and feasibility studies on
the remnant mineralisation. Metallurgical
testwork, Mineral Resource estimations, and
scoping studies were completed. Around
1996 the focus shifted again to regional
exploration for large tonnage basal contact
deposits.
In 2001 Titan Resources Ltd (Titan) acquired
the project and recommenced economic
evaluations of the remnant material at Carr
Boyd Rocks before embarking on another
regional exploration program focusing on the
basal contact.
An aeromagnetic survey,
airborne EM reprocessing, and several
programs of RAB and RC drilling were
completed.
From 2005 Yilgarn Mining entered a JV with
Titan and continued with some regional
exploration but focused most attention in and
around the Carr Boyd Rocks mine.
In 2007 Titan was acquired by Consolidated
Minerals Ltd (Consmin). Consmin conducted
IP surveys and detailed gravity surveys but
did not drill any targets before selling the
project to Salt Lake Mining (SLM) in 2013.
SLM completed limited drilling to meet
expenditure commitments, before selling the
project to Apollo Phoenix Resources in 2016.
Criteria
JORC Code explanation
Geology
•
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Data
aggregation
methods
Deposit type, geological setting and style of
mineralisation.
Commentary
•
Apollo sold the project to ESR in 2018.
•
The Project lies within the Achaean Yilgarn
Craton in a 700km belt of elongate deformed
and folded mafic, ultramafic rocks and
volcanic sediments intruded by granitoids
which is referred to as the Norseman-Wiluna
Belt. The belt has been divided into several
geological distinct terranes, with the project
area lying at the northern end of the Gindalbie
terrane (Swager, 1996). The geology of the
Carr Boyd area is dominated by the Carr
Boyd mafic-ultramafic intrusive complex
(“CBIC”).
•
Several distinctive styles of Ni and Ni-Cu
mineralisation have been identified within the
CBIC. At the Carr Boyd Rocks Nickel Mine NiCu mineralisation is hosted within several 20
to 60m diameter brecciated pipe-like bodies
that appear to be discordant to the magmatic
stratigraphy. Mineralisation is hosted by a
matrix of sulphides (pyrrhotite, pentlandite,
pyrite and chalcopyrite) within brecciated
bronzite and altered country rock clasts.
•
Stratiform Ni-Cu-PGE mineralisation has
been identified at several different locations
within the layered magmatic complex.
•
ESR is in the process of re-mapping and
reclassifying the Carr Boyd Igneous
Complex. Previous “Layered Intrusive”
models are misleading as the complex is
made up of many overprinted and
juxtaposed, smaller layered and non-layered
intrusives that have progressed from
ultramafic to mafic over time. The complex is
better described as a magma feeder zone,
where the earliest melts passing through the
Morelands Formation have assimilated
graphitic sulphidic shales, reached sulphur
saturation and deposited nickel sulphides
along basal contacts.
•
These basal contacts are not restricted to the
base of the complex, but can form within the
complex, wherever access was gained by
these earlier flows.
•
The complex has then been intruded and
inflated over time by progressively more
mafic, barren magmas to produce what we
see today.
• Exploration results with all relevant drillhole
information are reported in the body of the
text.
• All drill hole information relevant to this
resource report/statement has been included
in the appendices. No relevant drill hole
information has been excluded.
•
•
Exploration results with all relevant drillhole
information are reported in the body of the
text.
Significant Grade Intersections are reported on
a 0.5% Ni cut-off
Criteria
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
Reporting
Other
substantive
exploration
data
Further work
JORC Code explanation
• Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for
such aggregation should be stated and some
typical examples of such aggregations should
be shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘down hole length, true width
not known’).
Commentary
• Composite assay grades are determined by
geology and nickel-copper-sulphur content.
• Assays are length and SG weighted when
calculating
average
grades
over
an
intersection.
• Metal equivalent values have not been used.
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be included
for any significant discovery being reported.
These should include, but not be limited to a
plan view of drill hole collar locations and
appropriate sectional views.
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples - size and method of treatment;
metallurgical test results; bulk density,
groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating substances.
•
Relevant diagrams have been included within
the Mineral Resource report main body of
text.
•
All new drillhole information within this
announcement is reported
•
•
•
•
No other substantive data exists.
Everything meaningful and material is
disclosed in the body of the report.
Geological observations are included in the
report.
No bulk samples, metallurgical, bulk density,
groundwater, geotechnical and/or rock
characteristics test were carried out.
There are no known potential deleterious or
contaminating substances.
Further work by ESR may include a Scoping
Study for the T5 Mineral Resource estimate.
Refer to diagrams in the body of text within
the Mineral Resource report.
Diamond drilling and DHTEM geophysical
testing is continuing.
•
The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large- scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
•
•
•
•
•
•
•
Most drill holes were angled to 060° or 270°
so that intersections were orthogonal to the
orientation of mineralisation.
True widths have been stated where possible
however, the variable orientation of
mineralisation
within magma
feeders
combined with a structural overprint and
steep drill angles make true width
calculations highly misleading.
Section 3 Estimation and Reporting of Mineral Resources
Criteria
Database
integrity
JORC Code explanation
• Measures taken to ensure that data has not
been corrupted by, for example, transcription or
keying errors, between its initial collection and
its use for Mineral Resource estimation
purposes.
• Data validation procedures used.
Site visits
•
•
Geological
interpretation
•
•
•
•
•
Comment on any site visits undertaken by the
Competent Person and the outcome of those
visits.
If no site visits have been undertaken indicate
why this is the case.
Confidence in (or conversely, the uncertainty
of) the geological interpretation of the mineral
deposit.
Nature of the data used and of any
assumptions made.
The effect, if any, of alternative interpretations
on Mineral Resource estimation.
The use of geology in guiding and controlling
Mineral Resource estimation.
The factors affecting continuity both of grade
and geology.
Commentary
•
The data for this Mineral Resource estimate
was collected and logged using Excel
spreadsheets and validated using Micromine
Software. The data will be loaded into an
externally hosted and managed database.
•
It is assumed that due care was taken
historically with the process of transcribing
data from field notes into digital format for
statutory annual reporting.
•
All assays were reported by laboratories in
digital format reducing the likelihood of
transcription errors.
•
No site visit has been conducted by the
Competent Person, due to the level of study
so far conducted at the Project.
Share your feedback
Discover