Annual Report 2021
Released
Released
Announcement PDF
and its controlled entities
2021 ANNUAL REPORT
ABN: 39 151 155 207
Annual Report 2021
CONTENTS
DIRECTORS’ REPORT
3
REMUNERATION REPORT
21
AUDITORS’ INDEPENDENCE DECLARATION
27
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
28
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
29
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
30
CONSOLIDATED STATEMENT OF CASH FLOWS
31
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
32
DIRECTORS’ DECLARATION
57
INDEPENDENT AUDITORS’ REPORT
58
SHAREHOLDER INFORMATION
61
CORPORATE DIRECTORY
65
SCHEDULE OF EXPLORATION TENEMENTS
66
Annual Report 2021
2
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
DIRECTORS’ REPORT
Your directors present the following report on Estrella Resources Limited (“the Company”) and its wholly
owned subsidiaries (together referred to hereafter as “the Group”) for the financial year ended to 30
June 2021.
Directors
The names of directors in office at any time during or since the end of the period are:
Christopher Daws
Managing Director (appointed 18 November 2020)
Leslie Pereira
Non-Executive Chairman
John Kingswood
Non-Executive Director
Stephen Brockhurst
Non-Executive Director
Neil Hutchison
Non-Executive Director (appointed 18 November 2020)
Unless noted above, all directors have been in office since the start of the financial year to the date of
this report.
Principal activities
The principal activities of the Group during the reporting period were to explore nickel projects in
Western Australia.
Review of Operations
Estrella Resources Limited (ASX: ESR) (Estrella or Company) is pleased to provide its Review of
Operations for the full year ended 30 June 2021.
Work Summary
The focus of fieldwork and studies during the full-year were the Carr Boyd Nickel Project and Spargoville
Nickel Projects after the successful divestment of the Munda Gold Project.
CARR BOYD NICKEL PROJECT, WA 100%
The Carr Boyd Nickel Project is located some 80km NNW of the city of Kalgoorlie-Boulder in Western
Australia’s Goldfields Region (Figure 1). The Project comprises three Mining Leases and six Exploration
Licenses and can be accessed by the recently upgraded Scotia-Carr Boyd haul-road.
The Company considerably strengthened its exploration efforts at the Carr Boyd Nickel Project after
successfully intersecting significant massive nickel and copper sulphides at depth within the T5 Prospect
area in August 2020. Considerable work was undertaken on the geological front as well as on
infrastructure investment to boost our exploration effort.
Over the year, 26 diamond drill holes were collared and 11 more wedged daughter holes were
completed for a total of 14,675m of core across the project. Several geological programs were
Annual Report 2021
3
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
implemented to broaden the Company’s understanding of the geology and nickel potential across the
Carr Boyd Complex.
Additional to this was the installation of an office, coreyard, 16-man camp, laundry, kitchen and dining
facilities along with associated power and water infrastructure.
Figure 1: Carr Boyd Nickel Project located 80km NNE of Kalgoorlie-Boulder in WA's Goldfields Region.
The T5 Prospect is located 1.1km NNE of the historic Carr Boyd Rocks Mine (Figure 2) and was identified
in 2019 following RC drilling of a HP FLTEM anomaly 1. A diamond drill hole into the T5 prospect,
CBDD030 intersected 3.2m of massive sulphides grading 3.2% Ni, 0.6% Cu, 0.7g/t Pt+Pd and 2.5g/t
Au from 436.3m down hole. This hole was drilled 300m south of the original T5 discovery zone.
1 Assay Results Confirm New Sulphide Nickel Discovery Zone at Carr Boyd Rocks - 8 July 2019
Annual Report 2021
4
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
The massive sulphide core (Figure 3) lies within a broad 13.9m zone of mineralisation situated on the
T5 Pyroxenite basal contact.
Figure 2: Estrella Resources Tenure over the Carr Boyd Igneous Complex
Figure 3: Ni-Cu bearing massive sulphide zone in diamond drill hole CBDD030 drilled 300m south of
the T5 Ni-Cu discovery zone.
Annual Report 2021
5
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Economic Significance of the Basal Contact
CBDD030 and subsequent drilling highlighted to the Company that the mineralisation recently
discovered was significantly different to that located at the Carr Boyd Rocks Mine some 1,100m to the
SSE. The mine is located within a mafic sequence of rocks some 400m from the basal contact.
When studying other intrusive-style nickel deposits world-wide, it is clear that in almost all situations
where multiple intrusion complexes similar to Carr Boyd host mineralisation, the economically significant
deposits form in the earliest magmas of these complexes, and almost always on or within a short
distance from the basal contact. The basal contact is the lower-most point of an intrusion where gravity
assists the accumulation of sulphides (nickel, copper and or PGEs). Therefore when exploring these
complexes, exploration should focus on the basal positions of the earliest rock-types first.
The Carr Boyd Complex Basal Contact
Given the geological significance of the T5 Discovery and the age of the Carr Boyd Intrusive Complex,
the Company invested exploration funds into mapping and understanding the Carr Boyd internal
stratigraphy and that of the surrounding Morelands Formation. This enabled the company to understand
the direction that gravity, at the time of nickel-copper sulphide formation, was assisting to form sulphide
accumulations on the basal contact.
The company has mapped some 30km of basal contact, most of which is prospective for nickel
mineralisation, however historically, has received the least attention from previous explorers, with only
3km of basal contact being drilled below a depth of 30m.
Figure 4 below shows the mapped basal contact immediately surrounding the T5 Discovery and the
Carr Boyd Rocks Mine area. As can be seen, almost all historical nickel sulphide exploration hits have
been located very close to the basal contact, save for the Carr Boyd Rocks Mine itself.
The Company has subsequently developed a working geological model for the Carr Boyd Igneous
Complex, the T5 Discovery mineralisation and the off-contact Carr Boyd Pipes mineralisation. The
Company will continue to refine the model based on continuing exploration and collaborations with
external parties such as the CSIRO.
Seismic Research and Development Project
The Company saw developing the geological model as a priority in order to drive and enhance its
exploration activities at Carr Boyd. In order to use the model to test the basal contact at depth, it was
decided to conduct a hard-rock seismic survey which could be combined with several historical
geophysical datasets so that a 3D image of the basal contact could be constructed.
Annual Report 2021
6
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Figure 4: Mapped basal contact in relation to sulphidic sediments, assimilation zones where sulphides
enter the intrusion and nickel sulphides located at surface (NiS). Mapping reveals that the paleogravity direction is to the west (left) with younging to the east.
The Carr Boyd basal contact is the most prospective horizon within the Intrusive Complex. Historically
it been difficult to intersect in drilling due to its variable dip and in places, faulted nature. The imaging
of this contact should vastly improve the success rate of any targeted drilling at depth.
The company commissioned Graeme Hird from Rock Solid Seismic to assist with the interpretation. Mr
Hird is Australia’s most experienced hard-rock seismic interpreter. The seismic survey was conducted
by Eastern States company Ultramag in March of this year, utilising state-of-the-art equipment such as
the e-Vibe and Bluetooth nodes from Schlumberger.
Annual Report 2021
7
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
The e-Vibe system enabled access into areas where traditional seismic systems were too large and
destructive to operate effectively at Carr Boyd (Figure 5). In addition the system enabled precise
frequency control over the seismic source to enhance survey outcomes.
Figure 5: R&D Seismic Survey conducted by Ultramag enabled very low environmental impact seismic
surveying at Carr Boyd, allowing the company to image the prospective basal contact at depth ahead
of drill planning.
Working Geological Exploration Model for T5 and Carr Boyd Pipes
During the year the Company reconstructed a mineralisation model that would explain the relationship
between the Carr Boyd Pipes mineralisation and the T5 Discovery. Whilst other geological possibilities
exist that would have the T5 Discovery and the Carr Boyd Pipes as separate mineralisation events, the
proximity of the lodes to each other and similarity of the nickel-copper sulphides caused the Company
to look for a common source to explain both. Work on proving the model will continue.
Figure 6: Working hypothesis of the links between the T5 Discovery and the Carr Boyd Pipes
mineralisation.
Annual Report 2021
8
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
In essence, Carr Boyd pyroxenite feeder zones (intrusions) assimilated sulphides as they rose to surface
approx. 2.65 M.y.a. These assimilation zones were depicted in plan view in Figure 4 and
diagrammatically in Figure 6. This assimilation results in nickel sulphides forming, which accumulate
through gravity, settling onto the Western basal contact in “Trap Sites” such as at T5. Mineralisation at
T5 exhibits textures in core that show the sulphides have accumulated within their host pyroxenite on
and near the basal contact. Sulphide abundance increases toward the basal contact.
The Carr Boyd Mine resulted from a sulphur bleed off the basal contact into higher, less prospective
rocks (Figure 6), with mineralisation occurring as a sulphide mega-breccia. This bleed occurs because
massive sulphide liquids tend to remain molten long after the host intrusion has solidified. Pressure
differentials within the cooling intrusion can then cause the remobilisation of these still-molten
sulphides, forming pipe-like breccias as seen in the photograph at the top of Figure 6.
Combining the Working Model with the Seismic and other Geophysical Datasets
Figure 7: 3D rendering of the local basal contact around the T5 Discovery and Carr Boyd Rocks area.
The image above (Figure 7) is a combination of the working geological model and the 3D rendering of
the seismic survey combined with other geophysical datasets received from Rock Solid Seismic in late
June.
The resulting surface gives the Company the ability to target the T5 basal contact at depth without the
uncertainty that results from not understanding the orientations involved and hence drill hole depths
and angles required.
Annual Report 2021
9
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
T5 Drilling
Over the last year, 26 diamond drill holes were collared and 11 more wedged daughter holes were
completed for a total of 14,675m of core across the Carr Boyd Project. The majority of drilling was
located at the T5 Discovery where close spaced wedge drilling was combined with geological and
textural studies to ascertain the flow direction of the T5 Pyroxenite.
As at the end of the period, significant high-grade intersections can be seen in Figure 8. These
intersections are located within a broad mineralised halo of globular and disseminated sulphides.
Significant composite assays are reported in Table 1.
Figure 8: Massive sulphide intersections within a broad, mineralised halo of globular and
disseminated sulphides at T5.
Collar and survey details for the drill holes can be found in Table 2.
Annual Report 2021
10
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Table 1: T5 Significant Intersections
True
Hole
m From
m To
Interval
Width
Ni%
CBDD028 165.2
167
1.8
0.9
0.73
including 165.2
165.6
0.4
1.12
CBDD029 NSA - Hole did not test T5 contact
CBDD030 431.6
445.5
13.9
6.7
1.18
including 436.3
439.5
3.2
1.5
3.19
CBDD031 NSA - Hole did not test T5 contact
CBDD032 NSA - Fault blank, T5 contact not tested
CBDD033 368.5
388.6
20.1
9.6
1.04
including 372.52
378.4
5.88
2.8
1.39
and
380.7
382.8
2.1
1.0
1.37
386.15
388.6
2.45
1.2
1.65
Phase 2 and
CBDD034 NSA - Fault blank, T5 contact not tested
CBDD035 516.8
524.85
8.05
3.9
0.83
including 516.8
520.5
3.7
1.8
1.18
CBDD036 505.6
511
5.4
2.6
0.87
including 506.15
508.1
1.95
1.34
CBDD037 NSA - Fault blank, T5 contact not tested
CBDD038 Drinkwater Prospect, regional stratigraphic hole
CBDD039 NSA - Sheared T5 contact, low tenor sulphides
CBDD040 Drinkwater Prospect, regional stratigraphic hole
CBDD041 NSA - Sheared T5 contact, low tenor sulphides
CBDD042A 603.7
608.6
4.9
2.4
0.96
including 606.89
608.6
1.71
1.63
True
Hole
m From
m To
Interval
Width
Ni%
CBDD048 381.5
388.4
6.9
3.3
0.54
including 382.5
383.14
0.64
1.52
and
385.85
386.2
0.35
1.32
CBDD049A 386.67
393.58
6.91
3.3
0.75
including 388.49
390.36
1.87
1.74
CBDD049C 372.67
375.96
3.29
1.6
0.75
including 372.67
373.27
0.6
1.19
CBDD053 438.06
446.29
8.23
4.0
0.69
including 441.11
443
1.89
1.40
CBDD053A 426
428
2
1.0
0.46
CBDD053B 421.81
426.64
4.83
2.3
0.63
Phase 3 including 422.63 423.05
0.42
1.14
including 425.79
426.64
0.85
1.14
CBDD054 392.3
405.71
13.41
6.4
1.31
including 394.85
401.11
6.26
3.0
2.08
including 397.87
398.98
1.11
3.92
CBDD054A 361.21
387.54
26.33
12.6
0.73
including 361.21
362.27
1.06
1.03
including 364.41
365.56
1.15
1.47
including 376.34
379.05
2.71
1.3
1.10
CBDD054B
357
382.32
25.32
12.2
0.79
including 358.6
363.56
4.96
2.4
1.15
including 368.33
376.11
7.78
3.7
1.14
including 368.33
368.63
0.3
3.49
Cu%
0.34
1.07
Co%
0.04
0.06
2PGE **
0.65
0.91
Ag g/t
1.78
6.80
0.39
0.64
0.05
0.14
0.45
0.71
1.61
2.56
0.67
0.66
0.54
2.01
0.05
0.07
0.06
0.08
0.79
0.90
2.34
0.83
2.45
2.31
2.61
7.31
0.43
0.61
0.76
1.41
0.03
0.04
0.04
0.05
0.62
0.97
0.61
0.93
2.84
5.29
3.25
6.12
0.35
0.66
0.04
0.07
0.29
0.43
1.35
3.12
Cu%
0.26
0.21
0.36
0.54
0.54
0.53
1.07
0.32
0.34
1.43
0.50
0.62
0.47
0.44
0.63
0.16
0.44
0.55
1.02
0.65
0.58
0.71
0.93
0.08
Co%
0.03
0.08
0.06
0.04
0.08
0.04
0.06
0.03
0.07
0.02
0.03
0.05
0.05
0.06
0.09
0.17
0.04
0.06
0.08
0.06
0.04
0.06
0.05
0.15
2PGE **
0.41
0.95
0.61
0.48
0.90
0.58
0.72
0.45
0.59
0.52
0.47
0.92
0.72
0.46
0.67
0.59
0.70
0.47
1.97
1.03
0.58
1.13
0.72
0.89
Ag g/t
1.10
1.35
2.10
2.39
2.60
2.35
5.23
1.34
1.49
6.50
2.58
4.30
2.52
1.93
2.78
0.80
1.84
2.00
4.70
3.16
1.92
2.45
3.14
<0.5
** 2PGE refers to Pt + Pd in g/t
Annual Report 2021
11
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Table 2: Drill hole collar and survey details as at the end of June 2021.
Hole ID
CBDD028
CBDD029
CBDD030
CBDD031
CBDD032
CBDD033
CBDD034
CBDD035
CBDD036
CBDD037
CBDD038
CBDD039
CBDD040
CBDD041
CBDD042A
CBDD043
CBDD044
CBDD045
CBDD046
CBDD047
CBDD047A
CBDD048
CBDD049
CBDD049A
CBDD049B
CBDD049C
CBDD050
CBDD050A
CBDD051
CBDD052
CBDD053
CBDD053A
CBDD053B
CBDD054
CBDD054A
Final
Depth
251
603.8
495.7
591.8
335.6
450
412
581.7
576.8
420.8
155.7
609.7
439.8
480.7
654.7
495.3
699.8
480.98
563.1
562
277.1
420.4
240.2
414.6
390.5
415
411.4
447.5
Planned
Planned
514
484
460.2
461.4
415
Easting
Northing
RL
Dip
Azimuth
Status
367043.44
366998.82
367024.56
366936.17
367273.97
367392.58
367356.7
367438.42
367420.13
367418.35
365502.12
367450.74
365698.74
367405.46
367404.54
367449.2
367446.56
367395
366938
367394.5
367394.5
367423
367422.5
367422.5
367422.5
367422.5
367422
367422
6673937.98
6673936.74
6673640.27
6674240.78
6673938.89
6673655.88
6673939.2
6673657.55
6673620.88
6673621.16
6673071.37
6673708.36
6673200.04
6673500.16
6673500.34
6673940.44
6673707.34
6672840
6671877
6673656
6673656
6673626
6673626
6673626
6673626
6673626
6673626
6673626
437.72
438.35
434.1
442.69
434.37
429.67
432.63
429.5
429.24
429.39
432.32
429.78
434.72
428.8
428.68
431.98
429.82
425.41
425
429.7
429.7
429.2
429.2
429.2
429.2
429.2
429.2
429.2
-60
-70
-65
-65
-65
-65
-65
-65
-65
-60
-60
-65
-65
-60
-70
-65
-70
-60
-60
-70
-70
-61
-60
-60
-60
-60
-59
-62
90
90
90
90
270
270
270
270
270
270
270
270
270
270
270
270
256
265
310
270
270
261
265
265
265
265
267
267
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
367393.5
367393.5
367393.5
367393
367393
6673656
6673656
6673656
6673656.5
6673656.5
429.7
429.7
429.7
429.7
429.7
-70
-70
-70
-69
-69
270
270
270
267
267
Completed
Completed
Completed
Completed
Completed
The assays confirm the Company’s geological interpretation of the settling, remobilisation and re-settling
of massive sulphides along the T5 Pyroxenite Feeder basal contact. The intersections from diamond
drillholes CBDD048, CBDD049A and CBDD049C show higher-grade massive and breccia sulphides on
Annual Report 2021
12
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
the basal contact with only a thin zone of lower-grade material stratigraphically above. The lower-grade
material consists of disseminated sulphides that grade into globular sulphides just above the massive
sulphide zones. This represents the active erosion of massive sulphides in this location at the time of
solidification of the melt.
These sulphides are carried “down-stream” and are piled up above the massive sulphides intersected
in CBDD054, CBDD054A and CBDD054B (Figure 9). In CBDD054B there are two massive sulphide zones,
a lower basal contact breccia zone, and an upper semi-massive zone where remobilised globular
sulphides from the eroded area mentioned above are beginning to coagulate and descend through the
melt. Above this is a much broader zone of disseminated to blebby sulphides which remain suspended
by flow turbulence.
Figure 9: Massive and globular nickel sulphides from CBDD054B. The globular sulphides sit atop the
massive and represent active erosion of the massive sulphides by the crystalising melt.
Further down-stream, around holes CBDD053, CBDD053A and CBDD053B, a broad zone of globular,
blebby and disseminated sulphides was intersected and is interpreted to be an area where higher
turbulence prevented massive sulphide formation and in areas may even have scoured the contact of
massive sulphides. This is expected to be a cyclic repetition of scouring and redeposition along the flow
direction as evidenced by the intersection of massive sulphides further down the contact in holes
CBDD035, CBDD036 and CBDD042A (Figure 10).
Annual Report 2021
13
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Figure 10: Sulphide remobilisation in the flow direction and subsequent settling "down stream".
Going Forward
Identification of the controls on flow direction and nickel sulphide deposition indicate to the Company
that the T5 Pyroxenite is indeed one of the best prospects within the Carr Boyd Igneous Complex. As
such exploration over the next 12 months will focus here however the Company has not lost sight of
the fact that there is 30km of basal contact to be tested and that we are only just starting to scratch
the surface.
Magnetic imaging of the Carr Boyd Intrusive Complex (Figure 11) combined with Estrella’s mapping
shows that the T5 Pyroxenite is only one of several basal pyroxenites containing known nickel sulphides
and that there is a significant amount of exploration yet to occur in time.
Annual Report 2021
14
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Figure 11: The T5 Pyroxenite is only one of several mineralised pyroxenite bodies discovered within
the Carr Boyd Igneous Complex. Phase 5 will set about ranking these opportunities and discovering
currently unknown opportunities that will exist within such a large and fertile system.
MUNDA GOLD PROJECT, WA
The Company undertook a successful sales process of the Munda Gold Project with numerous offers
being made. Auric Mining Limited was the strongest bidder and the Company entered into a Tenement
Sale Agreement. Shareholders approved the divestment on the 25 September 2020 and completion of
the sale took place during the half-year with an upfront cash consideration received of $1,247,000 (ex
GST) from Auric Mining Limited. Following settlement Auric updated the Munda resource to greater
than 100,000oz triggering the deferred consideration milestone payment of $650,000 (ex GST) bringing
the total consideration received from the sale of Munda to $1,897,000 (ex GST).
SPARGOVILLE NICKEL RIGHTS PROJECT, 100% WA
The Company has been progressing the potential development of the high grade 5A nickel sulphide
deposit during the full-year with Permit of Work application and Exploration Notification being finalised
for the extraction of a bulk sample of the 5A ore for metallurgical testing. In light of the recent strength
in the nickel market and the positive outlook, the Company has undertaken steps towards
commercialisation of the 5A nickel sulphide Mineral Resource with discussions ongoing regarding the
treatment of potential high grade nickel sulphide ore recovered from shallow open pit mining.
Annual Report 2021
15
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Previous drilling has highlighted high grade nickel mineralisation very close to surface and a simple pit
cut back of the historic 5A mine has strong merit in light of the current nickel market.
The 5A nickel sulphide deposit is one of a number of significant nickel sulphide occurrences that make
up the Company’s 100% owned Spargoville Nickel Rights Project which was purchased at a time when
nickel projects were not in favour and nickel prices were much lower.
5A Nickel Sulphide Deposit
October 2019 Mineral Resource Estimate - Min Type (0.5% Ni Cut-off)
Type
Disseminated
Matrix/Breccia
Semi-massive/Massive
Total
Type
Disseminated
Matrix/Breccia
Semi-massive/Massive
Total
Type
Tonnage
kt
37
20
12
69
Indicated Mineral Resource
Ni
Cu
Ni
%
%
t
0.7
0.05
250
2.1
0.17
430
8.1
0.63
950
2.4
0.19
1,630
Tonnage
kt
41
17
1
58
Inferred Mineral Resource
Ni
Cu
Ni
%
%
t
0.7
0.10
270
2.5
0.13
410
7.6
0.35
60
1.3
0.11
730
Tonnage
kt
Disseminated
78
Matrix/Breccia
37
Semi-massive/Massive
13
Total
127
Competent Person Statement
Total Mineral Resource
Ni
Cu
Ni
%
%
t
0.7
0.08
520
2.3
0.16
840
8.0
0.61
1,000
1.9
0.15
2,370
Cu
t
20
30
70
130
Cu
t
40
20
70
Cu
t
60
60
80
190
The information in this announcement relating to Exploration Results is based on information compiled by Mr Steve
Warriner, who is the Exploration Manager of Estrella Resources and a member of The Australasian Institute of
Geoscientists.
The information in this announcement relating to the Spargoville 5A Mineral Resources is based on information
compiled by Mr Shaun Searle of Ashmore Advisory Pty Ltd, who was a consultant to Estrella Resources, and a
member of The Australasian Institute of Geoscientists, and Mr Neil Hutchison, who is a Director of Estrella
Resources and a member of The Australasian Institute of Geoscientists.
Mr Searle’s and Mr Hutchison’s assessment of the Spargoville 5A Mineral Resource has been reviewed by Mr
Warriner, who is the Exploration Manager of Estrella Resources and a member of The Australasian Institute of
Geoscientists. Mr Warriner has accepted the findings of the Mineral Resource Statement to be true and accurate
under the JORC2012 Code.
Mr Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner
consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears.
Annual Report 2021
16
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Significant changes in the state of affairs
In the opinion of the Directors, other than the matters as outlined in the operations report above, or as
set out in the accounts and notes thereto, there were no significant changes in the state of affairs of
the Group during the financial year.
Dividends
In respect to the current year, no dividends were paid or declared during the period by the Group and
no recommendation is made as to dividends.
Corporate Governance Statement
The Group has disclosed its corporate governance statement on the Company website at
www.estrellaresources.com.au/investor-centre.
Events subsequent to the reporting period
On 1 July 2021 the Company issued 10,000,000 unquoted options exercisable at $0.10 expiring 30 June
2022 to Henslow Pty Ltd for the provision of corporate advisory services.
On 5 July 2021 the Company issued 144,668,333 ordinary shares to Underwriters on the expiry of the
listed options exercisable at $0.05 expiring on 27 June 2021.
On 5 July 2021 the Company issued 11,678,685 ordinary shares on conversion of convertible notes with
a face value of $100,000 and associated interest of $16,787 at a conversion price of $0.01 per share.
On 6 July 2021 the Company issued 5,000,000 unquoted options exercisable at $0.05 expiring 1 June
2022 to Henslow Pty Ltd for underwriting services provided.
No other matters or circumstances since the end of the year have occurred that have significantly
affected or may significantly affect the operations, the results of the operations or the state of affairs
of the Entity in subsequent financial years.
Likely future developments and expected results
Further information, other than as disclosed this report, about likely developments in the operations of
the Group and the expected results of those operations in future years has not been included in this
report as disclosure of this information would be likely to result in unreasonable prejudice to the Group.
Environmental issues
The Group’s operations are subject to the laws and regulations pertaining to mining exploration
operations in Australia. As at the date of this Report the Group has not been notified of any breach of
any such laws or regulations.
Annual Report 2021
17
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Information on Directors
Mr Christopher Daws: Managing Director (previously CEO)
Date of appointment as Managing Director: 18 November 2020
Mr Daws is an experienced mining executive having previously been involved with Niagara Mining
(Poseidon), US Nickel and KMC Limited. Mr Daws is a Director and founder of Apollo Phoenix Resources
Pty Ltd and a Director of Nimbus Mines Pty Ltd. Mr Daws is responsible for running the day-to-day
operations of the Group.
Mr Daws is not currently and has not been within the last three years a Director of any publicly listed
Companies. Mr Daws currently holds 34,612,265 fully paid ordinary shares, 20,000,000 listed options
and 4,500,000 unlisted options in Estrella Resources Limited.
Mr Leslie Pereira– Non-Executive Director
Date of appointment: 1 February 2019
Mr Pereira is a WA based businessman and investor in the resources sector. Mr Pereira has previously
held senior management positions overseeing active mining operations in Indonesia. He has been
actively involved in capital raisings and promotions of a number of publicly listed companies.
Mr Pereira is not currently and has not been within the last three years a Director of any publicly listed
Companies. Mr Pereira currently holds 6,015,769 fully paid ordinary shares, 3,550,000 listed options
and 5,000,000 unlisted options in Estrella Resources Limited.
Mr John Kingswood – Non-Executive Director
Date of appointment: 6 January 2017
Mr Kingswood has over 25 years’ mining experience with significant experience in mining and project
management. Mr Kingswood has a track record of acquiring mineral projects and implementing effective
strategies.
Mr Kingswood is not currently and has not been within the last three years a Director of any publicly
listed Companies.
Mr Kingswood currently holds 3,380,000 fully paid ordinary shares, 20,000,000 listed options and
5,000,000 unlisted options in Estrella Resources Limited.
Mr Stephen Brockhurst – Non-Executive Director & Company Secretary
Date of appointment as Non-Executive Director: 3 April 2017
Date of appointment as Company Secretary: 29 October 2020
Mr Brockhurst is the founding Director of Mining Corporate Pty Ltd and has over 15 years’ experience
in the finance and corporate advisory industry and has been responsible for the preparation of the due
diligence process and prospectuses on a number of initial public offers. His experience includes
corporate and capital structuring, corporate advisory and company secretarial services, capital raising,
ASX and ASIC compliance requirements.
Mr Brockhurst has served on the board and acted as Company Secretary for numerous ASX listed and
private companies. He is currently a Director of Locksley Resources Limited and Nelson Resources
Limited and was previously a Director of Kingwest Resources Limited (resigned 30 June 2021).
Annual Report 2021
18
ESTRELLA RESOURCES LIMITED
AND CONTROLLED ENTITIES Re
DIRECTORS’ REPORT
Mr Brockhurst currently holds 2,500,001 fully paid ordinary shares and 5,750,000 unlisted options in
Estrella Resources Limited.
Mr Neil Hutchison – Non-Executive Director
Date of appointment: 18 November 2020
Mr Hutchison is a geologist with over 30 years’ experience in conducting regional and minesite
exploration, target generation, resource drill out, project reviews and evaluations. Mr Hutchison has
extensive n