Investor Presentation
Released
Released
Announcement PDF
ASX:ESR
TARGET = WORLD CLASS
HIGH QUALITY NICKEL
SULPHIDE RESOURCE
INVESTOR PRESENTATION
SEPTEMBER 2021
1
DISCLAIMER & DECLARATION
This presentation has been prepared by Estrella Resources Limited (“ESR”) as a summary of the company’s exploration and development activities, with particular reference to the
Carr Boyd Ni/Cu Project near Kalgoorlie, WA.
No Offer of Securities
The presentation is not, and should not, be considered as an offer or invitation to subscribe for, or purchase any securities in ESR, or as an inducement to make an offer or invitation
with respect to those securities. No agreement to subscribe for securities in ESR will be entered into on the basis of this presentation.
Forward Looking Statements
This presentation contains certain forward-looking statements which have not been based solely on historical facts but, rather, on ESR’s current expectations about future events and
on a number of assumptions which are subject to significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and advisers.
Due care and attention has been taken in the preparation of this presentation. However, the information contained in this presentation (other than as specifically stated) has not been
independently verified nor has it been audited. Accordingly, the company does not warrant or represent that the information contained in this presentation is accurate or complete. To
the fullest extent permitted by law, no liability, however arising, will be accepted by ESR or its directors, officers or advisers, for the fairness, accuracy or completeness of the
information contained in this presentation.
Competent Person Declaration
The Board authorised for this presentation to be released to ASX.
2
ASX: ESR
The information in this announcement relating to Exploration Results is based on information compiled by Mr. Neil Hutchison, who is a Director of Estrella Resources and a member
of The Australasian Institute of Geoscientists and Mr. Steve Warriner, who is the Exploration Manager, an employee of Estrella Resources and also a member of The Australasian
Institute of Geoscientists. Mr. Hutchison and Mr. Warriner have sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity
being undertaking to qualify as Competent Persons as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore
Reserves”. Mr. Hutchison and Mr. Warriner consent to the inclusion in the report of the matters based on his information in the form and context in which it appears.
ESTRELLA RESOURCES
Reliance on Third Party Information
EXECUTIVE SUMMARY
Estrella Resources is a WA-focussed nickel exploration company
in a Tier-1 mining jurisdiction
Acquired 100% ownership of Carr Boyd Intrusive Complex (2017)
including the ex-WMC Carr Boyd Rocks Nickel Mine
Have full regulatory and environmental approvals
ESTRELLA RESOURCES
Acquired nickel rights to the Spargoville Project, located 20km
South West of Kambalda, Western Australia
Significant potential upside of Carr Boyd and Spargoville to be
maximised through:
Experienced geological and management team
ASX: ESR
CSIRO partnership programs
In June 2021, Estrella achieved funding for the next 12 months of
exploration allowing maximum exposure to a rising nickel price
Cash balance of ~$8.1m (with additional ~$5.4M options “in the money”)
3
EV Demand Driving Nickel Outlook
Ni Price Forecast
20,000
16,000
12,000
Nickel has seen an increase in demand in correlation
with the growing importance of electric vehicles (EV)
Car manufacturers are adopting battery chemistries
with higher nickel content(1)
Nickel, $/t
4,000
0
2015
2016
2017
2018
Source: World Bank
2019
2020
2021
1.
2.
2022
2023
2024
2025
2030
2035
Source: Trafigura Research, SMM, CIAP
Source: Fitch Solutions
1.
ASX: ESR
These batteries are projected to hold 63% of the
electric vehicle market in six years(1)
ESTRELLA RESOURCES
Strong growth in EV production and demand with
increasing Government incentives globally
8,000
Source: Trafigura Research, SMM, CIAP
Source: Fitch Solutions
4
4
CARR BOYD
OVERVIEW
100% owned Ni-Cu-PGE Project
Continuous tenure covering 259km2
ESTRELLA RESOURCES
3 Mining Licenses and 6 Exploration
Licenses cover entire 75km2 mafic and
ultramafic igneous complex with multiple
nickel and copper sulphide occurrences –
most significant being the Carr Boyd
Rocks Nickel Mine and the T5 Discovery
ASX: ESR
Close proximity to potential customers and
processing hubs
5
CARR BOYD - HISTORY
GBM and NK acquired
by WMC, mined from
1973-1977
Placed into new ASX
float Defiance Mining
(1987) additional areas
consolidated
Titan JV to
Yilgarn Mining
(2006)
Pallinghurst
sell WA assets
to Salt Lake
Mining (2013)
Apollo sell
Carr Boyd
to Estrella
Resources
(2017)
Carr Boyd fully
funded,
progressing
exploration
program
ESTRELLA RESOURCES
WMC concentrated on
its Kambalda and
Leinster operations
Defiance transitions to
biotechnology and
sells asset to Titan
Resources (2001)
Titan retain 100% but
now owned by
Pallinghurst
SLM sell Carr
Boyd to Apollo
Phoenix
(private)
(2015)
Massive
Sulphides
Discovered at
T5 (2020)
6
6
ASX: ESR
Discovered by Great
Boulder Mines Ltd and
Kalgurli JV (1969 –
Yilgarn (now
Brockman) withdraw
from JV (2009)
CARR BOYD IGNEOUS
COMPLEX
Economic nickel-sulphide potential within
the ancient Carr Boyd Igneous Complex has
been significantly re-rated after Estrella’s
discovery, ending a 50-year slumber
Carr Boyd regional magnetic image. The prospective basal contact is shown in yellow and red.
Identification, mapping and drill-testing of
the 30km long, highly-prospective basal
contact continues at numerous sulphide
prospects within the tenement package
7
ASX: ESR
Estrella’s geological understanding of the
Carr Boyd Igneous Complex and
surrounding stratigraphy is growing rapidly
ESTRELLA RESOURCES
Estrella Resources accomplished this by
applying a new geological model to the
Igneous Complex and by drilling the most
prospective areas identified, discovering
new massive nickel-sulphides in 2020
CURRENT GEOLOGICAL MODEL ENHANCES
EXPLORATION
ASX: ESR
8
ESTRELLA RESOURCES
Carr Boyd pyroxenite feeder
zones (intrusions) assimilated
sulphides as they rose to
surface approx. 2.65 M.y.a.
(older than Kambalda)
This assimilation results in
nickel sulphides forming which
accumulate through gravity,
settling onto the basal contact
in “Trap Sites”
The Carr Boyd Mine resulted
from a sulphur bleed off the
basal contact into higher, less
prospective rocks
ESR returned exploration to
the much more prospective
basal contact with immediate
success at T5 in August 2020
CARR BOYD MINE
Mined from 1973 to 1977 by WMC
The ore pipes are located some 400m laterally
from the T5 basal contact within a gabbro host rock
Total production was 202,100t at 1.43% Ni and
0.46% Cu, producing a 9.7% Ni concentrate
Development of two pipes was completed on 3
levels with partial stoping, including a glory hole
through to the surface
ASX: ESR
Remaining JORC2004 Resource of 636,000t at
1.4% Ni and 0.5% Cu
ESTRELLA RESOURCES
Four ore pipes have been located so far, containing
a central zone of brecciated and stringer sulphides
surrounded by broader zones of strongly
disseminated sulphide mineralisation
Estrella is exploring the possible links at depth
between this mineralisation and the massive
sulphides discovered at T5 in 2020
9
CURRENT
GEOLOGICAL MODEL
MINIMISES RISK
99.9% of economic intrusive nickel
deposits occur within basal contact trap
positions
Due to the depths involved, intrusive nickel
exploration invariably involves “direct
detection” through drilling and down-hole
electromagnetics (DHEM)
10
ASX: ESR
Carr Boyd regional magnetic image. The prospective basal contact is shown in yellow and red
Exploration $$ risk is therefore minimised
by focussing on and systematically testing
the basal contact (where 99.9% of
economic nickel is found) through surface
mapping, 3D imaging, geological targeting,
drilling and DHEM
ESTRELLA RESOURCES
Historic exploration mainly focussed on
the Carr Boyd Pipes, statistically a 0.1%
chance of another economic discovery
PLAN VIEW
B
T5 OPPORTUNITY
The basal pyroxenite host rock at T5 extends 3.5km north and 1.5km
south of the current drill position
Basal contact testing outside the current T5 drill area (green area centre
of image below) has begun
T5 is one of several mineralised basal pyroxenites within the Carr Boyd
Igneous Complex to be tested in time
A
A
Basal Contact
0m
600m
900m
1200m
11
3D Rendering of T5 Basal Contact
ASX: ESR
300m
B
ESTRELLA RESOURCES
Initial scout RC drilling above 300m depth is planned with follow-up
deeper diamond drilling down to 900m and DHEM
T5 DISCOVERY – PHASE 3 & 4
Phase 3 combined close
spaced wedge drilling
and step-out drilling with
DHEM
12
ASX: ESR
Phase 4 will step North
(for 3km) and South
(1.5km) and also begin
testing T5 at depth
utilising seismic results
and DHEM
ESTRELLA RESOURCES
Phase 3 drilling
successfully determined
plunge direction,
mineralisation vectors
and confirmed basal
contact mineralisation
CARR BOYD EXPLORATION STRATEGY
Near term catalysts and continual news flow
Carr Boyd Project
Phase 3
Q3 FY22
Q4 FY22
FY23-FY24
Upper T5 Discovery Area
2,500m RC to test T5 up-plunge
extensions
Potential JORC Inferred
Resource &
Metallurgical Studies
Scoping Studies and JORC Indicated Resource
Drilling
T5 Discovery Area Step-out
Sections
1,500m RC pre-collars
3,500m DD with DHEM
Metallurgical Studies
Inferred Resource Drilling ahead of Scoping Study
T5 North & Dunn Basal Contact
12,500m RC testing basal contact to
300m
Follow-up RC/DD on new targets
T5 South and Carr Boyd
800m DD with DHEM (R&D seismic
holes)
T5 Discovery Area Step-out
Sections
2,500m RC pre-collars
3,500m DD + DHEM
T5 North & Dunn Basal Contact
5,000m RC pre-collars
6,000m DD + DHEM
5,000m RC pre-collars
6,000m DD + DHEM
800m RC/DD with DHEM (R&D
seismic)
1,200m RC/DD with DHEM (R&D
seismic)
T5 South and Carr Boyd
800m RC/DD with DHEM (R&D
seismic)
CSIRO and ESR Research
Partnership
Intrusion emplacement, timing,
chemical and mineralisation studies
with CSIRO
2,500m RC pre-collars
3,500m DD + DHEM
Statutory Tenement Reductions
(East & South)
RC = Reverse Circulation Drilling
1,200m RC/DD with DHEM
(R&D seismic)
RC drilling of CSIRO Partnership generated targets
Follow-up diamond drilling
? Resource drilling
10,000m RC testing basal
contact to 300m
FLTEM + DHEM
Follow-up diamond drilling
ASX: ESR
Tregurtha Pyroxenite Basal
Contact
Licensing
Inferred Resource Drilling ahead of Scoping Study
Regolith and mineralisation
vectoring studies with CSIRO
10,000m RC testing basal
contact to 300m
FLTEM + DHEM
Schmidt Pyroxenite Basal
Contact
Phase 5
Q2 FY22
ESTRELLA RESOURCES
Phase 4
Q1 FY22
Possible camp upgrade as
necessary
DD = Diamond Drilling DHEM = Downhole Electromagnetics FLTEM = Surface Fixed Loop Transient Electromagnetics
Our focus is on the exploration and development of nickel projects and
increasing shareholder value
13
INVESTMENT
OPPORTUNITY
Active nickel explorer in a tier-1 mining jurisdiction
ESTRELLA RESOURCES
Focused on discovery of a World Class, High Quality,
Nickel Sulphide Resource
Using knowledge and technology as a key weapon
Experienced board and management in exploration with
innovative approach to mining and development of
metal deposits
Well funded to progress exploration campaigns
ASX: ESR
Highly leveraged to success
Future development options include:
Sell ore for toll concentrating
14
Construct flotation circuit
14
EXPERIENCED BOARD & MANAGEMENT
CHRISTOPHER DAWS
Managing Director
Experienced in running junior resources companies, including previous involvement with Niagara Mining (Poseidon
Nickel), US Nickel and KMC Limited. Director and founder of Apollo “Phoenix” Resources Pty Ltd and a Director of
Nimbus Mines Pty Ltd.
JOHN KINGSWOOD
Non-Executive Director
Experienced mining professional with over 25 years in the engineering services industry specializing is underground
mine infrastructure. Successful businessman with a track record of acquiring mineral projects and implementing
effective business strategies. Currently a Director of Apollo “Phoenix” Resources Pty Ltd and Nimbus Mines Pty Ltd
(a resource investment group).
STEVE BROCKHURST
Non-Executive Director &
Company Secretary
15 years’ experience in the finance and corporate advisory industry and is a Director of Mining Corporate Pty Ltd.
His experience includes corporate and capital restructuring, corporate advisory, company secretarial services,
capital raising, ASX and ASIC compliance requirements. Has served on the Board and acted as Company Secretary
for numerous ASX listed and private companies.
NEIL HUTCHISON
Non-Executive Technical Director
A geologist with over 30 years’ experience in conducting regional and minesite exploration, target generation,
resource drill out, project reviews and evaluations. Extensive nickel experience having been the General Manager
for Geology at Poseidon Nickel for 11 years as well as the Exploration Superintendent at Jubilee Mines Cosmos
Nickel Project for 5 years.
STEVE WARRINER
Exploration Manager
Highly experienced in successful exploration for nickel sulphide deposits. Was previously Chief Geologist at
Poseidon Nickel Limited for 14 years. Over 30 years’ experience in the resource/mining industry in WA and
overseas with over 20 of these years exploring for and mining intrusive and extrusive nickel deposits in WA.
15
ASX: ESR
Experienced investor and businessman with involvement in small companies and maximising their potential value.
Heavily involved in driving growth of Majestic Resources / Petra Diamonds – now merged with Petra Diamonds –
and, subsequently, Kangaroo Resources (Indonesia).
ESTRELLA RESOURCES
LESLIE PEREIRA
Non-Executive Chairman
CAPITAL STRUCTURE (AS AT 1 September 2021)
Options
10,000,000 10c exercise June 2022
5,000,000 5c exercise June 2022
11,500,000 3c exercise Nov 2022
254,363,575 2c exercise July 2023 (ASX: ESROA)
16,600,000 20c exercise Nov 2023
Convertible Notes
$190,000 1c conversion, expiry Feb 2022 12%PA
Major Shareholders
Regal Funds Management
10.89%
Gallin
3.46%
Sunset Capital Management
3.23%
CASH
ASX: ESR
1,162,043,740
ESTRELLA RESOURCES
FPOS
~ A$8.1M (As at 1 September 2021 with additional ~A$5.4M “options in the money”)
16
Contact:
Chris Daws
Managing Director
M: +61 8 9481 0389
E: info@estrellaresources.com.au
PHASE 2 AT T5 – DIAMOND
DRILLING RESULTS
T5 has yielded several highly significant intersections to date2 containing nickel, copper,
cobalt, platinum, palladium and silver in the Company’s Phase 2 step-out drilling
Phase 2: 6,464m drilled in 13 diamond holes
Phase 3: 8,211m drilled in 13 diamond holes and 11 wedge holes
Interval
1.8
0.4
13.9
3.2
20.1
5.88
2.1
2.45
8.05
3.7
5.4
1.95
4.9
1.71
Ni%
0.73
1.12
1.18
3.19
1.04
1.39
1.37
1.65
0.83
1.18
0.87
1.34
0.96
1.63
Cu%
0.34
1.07
0.39
0.64
0.67
0.66
0.54
2.01
0.49
0.76
0.76
1.41
0.35
0.66
Co%
0.04
0.06
0.05
0.14
0.05
0.07
0.06
0.08
0.03
0.04
0.04
0.05
0.04
0.07
2PGE **
0.65
0.91
0.45
0.71
0.79
0.90
2.34
0.83
0.62
0.97
0.61
0.93
0.29
0.43
Ag g/t
1.78
6.80
1.61
2.56
2.45
2.31
2.61
7.31
2.84
5.29
3.25
6.12
1.35
3.12
Note: Intervals quoted are downhole lengths, true widhts are not known
** 2PGE refers to Pt + Pd in g/t
2. See ASX Announcement dated: 1/2/2021
18
ASX: ESR
m To
167
165.6
445.5
439.5
388.6
378.4
382.8
388.6
524.85
520.5
511
508.1
608.6
608.6
ESTRELLA RESOURCES
Hole
m From
CBDD028
165.2
including
165.2
CBDD030
431.6
including
436.3
CBDD033
368.5
including 372.52
and
380.7
and
386.15
CBDD035
516.8
including
516.8
CBDD036
505.6
including 506.15
CBDD042A 603.7
including 606.89
PHASE 3 AT T5 – DIAMOND
DRILLING RESULTS
** 2PGE refers to Pt + Pd in g/t
Interval
6.9
0.64
0.35
6.91
1.87
3.29
0.6
6.39
1.03
0.68
0.97
6.82
0.48
0.41
8.23
1.89
2
4.83
0.42
0.85
13.41
6.26
1.11
26.33
1.06
1.15
2.71
25.32
4.96
7.78
0.3
7.04
0.96
18.43
8.49
1.87
0.33
4.25
1.48
0.3
0.53
24.32
7.12
2.93
0.72
14.14
5.41
2.78
1.32
1.18
True
Width
3.3
3.3
1.6
3.1
3.3
4.0
1.0
2.3
6.4
3.0
12.6
1.3
12.2
2.4
3.7
3.4
8.8
4.1
2.0
11.7
3.4
1.4
6.8
2.6
s
Ni%
0.54
1.52
1.32
0.75
1.74
0.75
1.19
0.76
1.38
1.14
1.14
0.58
1.51
1.02
0.69
1.40
0.46
0.63
1.14
1.14
1.31
2.08
3.92
0.73
1.03
1.47
1.10
0.79
1.15
1.14
3.49
0.60
0.77
0.64
0.91
1.12
1.44
0.99
0.90
1.07
0.99
0.82
1.10
1.10
2.45
1.05
1.45
1.39
1.07
2.07
Cu%
0.26
0.21
0.36
0.54
0.54
0.53
1.07
0.44
1.25
0.71
0.23
0.51
0.90
0.64
0.32
0.34
1.43
0.50
0.62
0.47
0.44
0.63
0.16
0.44
0.55
1.02
0.65
0.58
0.71
0.93
0.08
0.53
1.17
0.92
1.01
1.96
0.44
1.03
4.23
7.92
5.14
0.44
0.61
0.41
0.36
0.58
0.88
1.10
0.77
0.31
Co%
0.03
0.08
0.06
0.04
0.08
0.04
0.06
0.04
0.07
0.06
0.06
0.03
0.08
0.05
0.03
0.07
0.02
0.03
0.05
0.05
0.06
0.09
0.17
0.04
0.06
0.08
0.06
0.04
0.06
0.05
0.15
0.03
0.04
0.03
0.05
0.06
0.07
0.05
0.04
0.05
0.05
0.04
0.05
0.05
0.12
0.04
0.06
0.06
0.04
0.09
2PGE **
0.41
0.95
0.61
0.48
0.90
0.58
0.72
0.48
1.42
0.50
0.28
0.59
0.71
0.90
0.45
0.59
0.52
0.47
0.92
0.72
0.46
0.67
0.59
0.70
0.47
1.97
1.03
0.58
1.13
0.72
0.89
0.70
0.53
0.53
0.74
1.03
0.85
0.77
0.45
0.58
0.57
0.57
0.58
0.68
0.68
0.59
0.83
0.69
0.94
0.47
Ag g/t
1.10
1.35
2.10
2.39
2.60
2.35
5.23
1.62
4.72
3.40
1.10
1.83
4.70
2.60
1.34
1.49
6.50
2.58
4.30
2.52
1.93
2.78
0.80
1.84
2.00
4.70
3.16
1.92
2.45
3.14
<0.5
2.28
6.00
3.76
4.09
8.72
1.90
4.05
18.34
34.20
21.40
1.85
2.33
1.82
2.40
2.46
3.91
4.43
3.20
19
1.18
ASX: ESR
See ASX announcement dated 30th July 2021 and 2nd August 2021
m To
388.4
383.14
386.2
393.58
390.36
375.96
373.27
394.79
390.59
393.47
394.79
403.51
397.63
399.52
446.29
443
428
426.64
423.05
426.64
405.71
401.11
398.98
387.54
362.27
365.56
379.05
382.32
363.56
376.11
368.63
363.1
357.02
397.53
392.27
385.65
386.87
392.27
397.53
396.35
397.53
372.64
365.52
371.12
378.93
422.48
413.75
414.39
417
422.48
ESTRELLA RESOURCES
Massive and globular nickel-copper-iron sulphide
breccias in CBDD054B at 368m
Hole
m From
CBDD048
381.5
including
382.5
and
385.85
CBDD049A 386.67
including 388.49
CBDD049C 372.67
including 372.67
CBDD050
388.4
including 389.56
including 392.79
including 393.82
CBDD050A 396.69
including 397.15
including 399.11
CBDD053 438.06
including 441.11
CBDD053A
426
CBDD053B 421.81
including 422.63
including 425.79
CBDD054
392.3
including 394.85
including 397.87
CBDD054A 361.21
including 361.21
including 364.41
including 376.34
CBDD054B
357
including
358.6
including 368.33
including 368.33
CBDD055 356.06
including 356.06
CBDD055
379.1
With
383.78
including 383.78
including 386.54
including 388.02
And
396.05
including 396.05
including
397
CBDD055A 348.32
including
358.4
including 368.19
CBDD055A 378.21
CBDD055B 408.34
With
408.34
including 411.61
including 415.68
including
421.3
Share your feedback
Discover