Timor-Leste Drilling and Exploration Update
Released
Released
Announcement PDF
ASX: ESR
15 August 2025
Timor-Leste Drilling and Exploration Update
HIGHLIGHTS
➔ Additional trenching at Ira Miri located Primary manganese mineralisation within the Noni
Formation with significant secondary enrichment overprint (Figures 1-2)
➢
Line of strike of the Primary manganese beds have been mapped and approximate known
outcrop locations over a 450m length and open (Figure 3) with more trenching planned
➔ First-pass stratigraphic drilling completed (16 diamond holes), defining Noni Formation orientation
and weathering profile
➢
Angled drilling to commence targeting specific Primary manganese beds intersecting the
weathering profile outlined in first-pass (Figure 4)
➢
Additional geological personnel employed by Estrella for in-country training and supervision
➢
Another crew engaged by CoreSearch to enable continuous drilling
➔ Plans underway to extract up to a 30,000 tonne bulk sample of manganese oxides from Ira Miri for
market appraisal purposes
➔ Site visit by representatives from World Metals and Alloys and REM to Ira Miri and the Werumata
Limestone Project in Baucau along with our joint-venture partners Murak Rai Timor
➢
Environmental applications for drill permitting to be finalised this week which will allow for
resource definition drilling at the Werumata Limestone Project to commence
➢
RC/DD capability assembled in Dili ready for drilling out the Werumata Project resource
Figure 1: Primary manganese bedding in Noni Formation at Ira Miri. The in-situ beds and surrounding muds are undergoing
secondary enrichment, confirming the exploration model put in place for the Lautem region. The primary and secondary
manganese mineralisation contain visual estimates of >80% manganese-iron oxides with minor carbonate and silica. The
mineralisation contains a more recent detrital enrichment phase where weathered secondary material is accumulating in
the soil profile. Samples will be taken from the trenching and sent to the laboratory in Jakarta for analysis, with results
expected in approximately 6 weeks subject to transport and laboratory scheduling.
_____________________________________________________________________________________________________________
Office Address London House, Level 8, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Cautionary Statement of Visual Estimates
The Company draws attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be
considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest.
Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations.
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce drilling and
exploration updates to the Company’s Ira Miri Manganese Project and Werumata Limestone Project in
Timor-Leste.
Ira Miri Manganese Project
Continued trenching at the Ira Miri Manganese Project has identified in-situ Primary manganese bedding
within the Noni Formation that, when exposed by weathering and erosion, has undergone significant
secondary enrichment. The enriched primary beds can be seen in Figure 1 and in Figure 2 Top, where up
to three parallel primary (hypogene) beds have been mapped. Significant detrital material can be seen in
Figure 2 Bottom composed of remobilised boulders of secondary-enriched Noni Formation along with recementation of the recent soils and detrital manganese.
Figure 2: Top: In-situ secondary enrichment
Bottom: Boulders of secondary material and recemented
detrital material. The primary and secondary manganese mineralisation are estimated to contain >80%
manganese-iron oxides with minor carbonate and silica. Samples will be taken from the trenching and
sent to the laboratory in Jakarta for analysis, with results expected in approximately 6 weeks. Refer to
Cautionary Statement regarding visual estimates.
Figure 3: Location of the mapped detrital and subcropping secondary manganese along with the
geological boundary between the Noni Formation (manganese potential) and the underlying Triassic
sediments.
Additional trenching is being planned to follow the sub-cropping primary zones along strike to the north and
to the south so as to enable accurate drill targeting of the mineralisation.
Commenting on the validation of the geological model, Estrella Managing Director Chris Daws said:
“We are very encouraged by the latest results from Ira Miri, where trenching has confirmed primary
manganese mineralisation within the Noni Formation and highlighted significant secondary enrichment.
Mapping of the strike length is providing us with a clear framework for the next phase of work, and our recently
completed first-pass drilling has already defined the formation’s orientation and weathering profile.
With additional geological expertise now on the ground and a second crew engaged to keep the drills turning,
we are well positioned to advance both Ira Miri manganese and Werumata limestone projects at pace.
Importantly, we are also preparing to extract a large bulk sample of manganese oxides for market appraisal,
while recent site visits by representatives from World Metals and Alloys and from REM underscore the
growing commercial interest in our projects. It’s full steam ahead at Estrella!”
With the majority of the stratigraphic drillholes completed, Estrella is now in a position to target the primary
mineralisation through angled drilling and follow this up into the weathering profile to target supergene
mineralisation (Figure 4).
Importantly, several primary horizons have been identified in the trenching and this leads to thickening of
the supergene blanket surrounding the weathered portions of the Noni Formation at these points. Once the
angled drilling commences, the Company will be able to define the buried primary hypogene horizons
properly and project them back up into the weathering profile where supergene development occurs.
The drilling will initially concentrate on the northern and southern outcrop zones and progressively infill
between them to delineate the secondary and detrital mineralisation surrounding the primary mineralisation.
A combination of some deeper drilling and geophysics may be used to explore for buried secondary
enrichment. The Company is looking at various drone geophysics options such as MobileMTd from Expert
Geophysics which will image apparent resistivity and apparent conductivity utilising audio-frequency
magnetotellurics. This will be similar to ground-based IP only the data will be able to be inverted and utilised
in 3D.
The drilling contractor CoreSearch has put on an additional team of drillers and offsiders so as to keep the
diamond drill in continuous operation. This has resulted in improved monthly drill metres.
Figure 4: Primary manganese enrichment zone model applicable to Ira Miri.
Assays
The Company has had delays in getting samples to Jakarta for analysis with the intended Indonesian
Contractor being unable to meet their transportation and permitting obligations. As a result, previous core
samples remain in Dili. The Company has secured a workable solution and expects the samples to depart
shortly for the Jakarta laboratory for analysis. Estrella management has opted for the full sample to be
transported to Jakarta rather than a pre-prepared subsample in Dili to ensure full JORC compliance.
Market Appraisal Sample
Estrella is seeking permission from the regulatory authorities to take a bulk sample of Manganese Oxides
from Ira Miri for Market Appraisal purposes. Up to 30,000t sample will be transported to Com Port where it
will be shipped to potential clients for testing. The sample will come from the identified outcropping
mineralisation at the EMDD001 area. The area will be rehabilitated, replanted and regenerated once the
sample has been removed through trenching, similar to the process seen in Figure 2 Left. The list of
potential destinations include India, Japan, China, Malaysia, Australia, Europe, USA, and Africa.
Werumata Limestone Project
The Company hosted a site visit by representatives from World Metals and Alloys and from REM to Ira
Miri and the Werumata Limestone Project in Baucau along with our joint-venture partners Murak Rai
Timor.
The Company is finalising the environmental documents necessary to apply for the drilling permits so that
the drill program can commence immediately on receipt from authorities. (Figure 5).
Figure 5: The location of the 1 Billion Tonne Limestone Resource being targeted in the Ueru-Mata area of Baucau Municipality.
Approximately 40 RC drillholes with diamond tails will initially be drilled to define the resource. The
Company has been working closely with the local community to identify sacred and cultural locations that
need to be preserved. Only 2 sites have been identified and they have minimal impact on the southern
border of the intended Resource. In addition, agreement has been obtained to locate all infrastructure
immediately to the west of the Resource area.
The RC/DD rig brought over from Australia has been assembled in Dili for the Werumata drill program.
The drill is capable of around 120m of RC with 1200 cfm of air and several hundred metres of diamond
core. The changeover time from RC to diamond is quick and the track mount system ideal for hilly
access.
Figure 6: CoreSearch RC/DD rig with 1200 cfm of compressed air.
Next Steps
The drilling at Ira Miri will commence with angled holes targeting identified Primary mineralisation and
following it through the weathering profile where it undergoes secondary enrichment.
The Werumata drilling applications will be submitted to the regulatory authorities this week for drilling
approval.
The mapping team will work on the Baucau Exploration Licenses for the next three months to follow similar
primary mineralisation trends into areas where they go below cover and secondary supergene development
may be preserved.
Assays are expected to be reported for the initial Ira Miri drill holes before the current quarter ends.
ENDS
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Forward Looking Statements
This announcement contains certain forward-looking statements which have not been based solely on historical facts
but, rather, on ESR’s current expectations about future events and on a number of assumptions which are subject to
significant uncertainties and contingencies many of which are outside the control of ESR and its directors, officers and
advisers.
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Group Exploration Manager of Estrella Resources, and a member of The Australasian Institute of
Geoscientists. Mr Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Warriner consents
to the inclusion in the report of the matters based on their information in the form and context in which it appears.
Cautionary Statement of Visual Estimates
This announcement contains references to visual results and visual estimates of mineralisation. The Company draws
attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be considered
a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties
relevant to valuations.
APPENDIX 1 JORC TABLE 1 – TIMOR-LESTE EXPLORATION
Section 1 - Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects
of
the
determination
of
mineralisation that are Material to the Public
Report. In cases where ‘industry standard’
work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Commentary
•
Determination of mineralisation has been
based on geological mapping, visual
mineral estimates and confirmation of
metallic concentration using a Bruker S1
Titan Portable XRF instrument.
•
Initial rock-chip samples were taken and
pXRF determinations on uncrushed
samples made in the field.
•
Samples are then brought back to Dili and
pulverized to 100% passing 1mm before
the powder is again subjected to PXRF
•
A sub-sample of 150g is then dispatched
through customs and quarantine in
Australia to ALS in Malaga for multielement analysis.
•
Exported samples are analysed using a 4acid digest, ME-XRF26s, ME-MS61L at
ALS in Malaga
•
Drillcore has been cut in half using a
diamond saw and samples sent to PT
Geoservices in Jakarta for analysis.
•
Diamond drilling has been undertaken
utilising HQ and PQ triple tube.
•
Method of recording and assessing core and
chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
•
Recoveries are calculated based upon the
depth drilled and compared to core
recovered.
There may be a relationship between
sample recovery and grade given the
nature of the secondary manganese
enrichment.
Sample recovery will be maximised utilising
PQ3 drilling.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
sub-sampling
stages
to
maximise
•
•
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
•
•
•
•
•
•
•
Rock-chip samples were geologically
logged
for
mineral
content
and
photographed prior to sending for assay or
screening by pXRF.
Drill core has also been geologically
logged but will not be samples due to poor
recovery.
The trench has been mapped and
samples.
Sample sizes are appropriate to the grain
size of the mineralisation which in
manganese oxides is very fine.
The exploration program is in its very early
stages and initial sample sizes are kept
small due to freight and customs /
quarantine restrictions. They are not
considered representative of the bulk of
mineralisation.
Sampling on low recovery drillholes will
not take place as there may be a
Criteria
Quality of
assay data
and
laboratory
tests
JORC Code explanation
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Commentary
relationship between recovery and grade.
•
•
•
•
•
•
Verification
of sampling
and
assaying
Location of
data points
•
•
•
•
•
•
•
Data spacing
and
distribution
•
•
•
Orientation
of data in
relation to
geological
structure
•
•
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
•
Three sample types are quoted:
1 – Uncrushed Field PXRF (a fresh mineral
face is chipped from samples prior to the
XRF determination in the field)
2 – Crushed PXRF (samples from above
are taken back to Dili, 1-3kg of material,
and crushed/pulverised to 100% passing
1mm in the company’s dedicated sample
preparation facility, and 15g of powder is
then taken for PXRF analysis. Crushed
PXRF
determinations
have
been
subjected to repeat samples, standards
and confirmation of accuracy by laboratory
analysis.
3 – Assay, where 150g of material is
exported to ALS in Malaga via quarantine
in Darwin. Standards and blanks have not
been included in samples sent to Australia.
The company relies on the internal
standards and blanks used by ALS.
Samples are being analysed at ALS in
Malaga using a 4-acid digest, ME-ICP for
61 elements and all samples are also
being tested for Pt, Pd and Au by fire assay
and ICP-MS finish on a 50g sub-sample.
Currently, uncrushed field samples are
being analysed by PXRF on location,. The
Cautionary statement is included when
assessing pXRF.
No prior modern exploration has been
conducted in the area.
•
No adjustments to assay data were
undertaken save where the ME-XRF26s
method reports MnO%.
•
Mn% is derived by dividing MnO by 1.2912
•
Timor personnel use GRID software on
mobile phones to record GPS locations,
sampling data and photographs. Mobile
phone accuracy (shown during coordinate
capture) is set at a maximum tolerance of
5m.
Topographic control is accomplished
using 30m spaced satellite point data.
No systematic sampling has been
conducted at this early stage.
•
•
•
No orientation-based sampling bias has
been identified.
Criteria
Sample
security
JORC Code explanation
introduced a sampling bias, this should be
assessed and reported if material.
• The measures taken to ensure sample
security.
Commentary
•
•
Audits or
reviews
•
The results of any audits or reviews of
sampling techniques and data.
•
•
•
Exported samples are in the possession of
ESR personnel from field collection to
customs
submission
in
Darwin.
Possession
then
passes
to
the
Department of Agriculture, Forestry and
fisheries where Northline Couriers pick up
the samples and take them by road to ALS
in Malaga.
Drill core remains in the care of ESR
personnel until handover to ABC Express
in Indonesia who deliver the samples to
the lab in Jakarta.
No independent audit or review has been
undertaken.
Internal QAQC involves frequent standard
checks on the PXRF instrument to
determine any drift of accuracy.
Additional checks involve analysis of any
assayed samples in comparison to the
crushed and uncrushed in-country PXRF
determinations so as to provide
confidence in in-country analysis.
Section 2 - Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness
or
national
park
and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
Exploration
done by other
parties
•
Acknowledgment
and
appraisal
exploration by other parties.
Geology
•
Deposit type, geological setting and style of
mineralisation.
of
Commentary
•
Exploration and Evaluation Concessions
MEL2023-CA-ZA001,
MEL2023-CAZA002 and MEL2023-CA-ZA003 are
awarded for two years to Estrella Murak
Rai, forming the joint-venture between
Estrella
Resources
Representante
Permanente (70%) and Murak Rai Timor
(30%).
•
Reconnaissance Permits ESR-RP-01,
ESR-RP-02, ESR-RP-03, ESR-RP-04,
were converted to Exploration Licenses
and are awarded to Estrella Resources
Limited
Representante
Permanente
(100%)
•
Exploration and Evaluation Concessions
MEL2024-DA-ZB001,
MEL2024-DAZB002 and MEL2024-DA-ZB003 are
awarded for four years to Estrella Murak
Rai, forming the joint-venture between
Estrella
Resources
Representante
Permanente (70%) and Murak Rai Timor
(30%).
•
Estrella also operated Reconnaissance
Permits ESR-RP-01, ESR-RP-02 and
ESR-RP-03
•
Estrella
Resources
Limited
Representante Permanente and Estrella
Murak Rai are registered in Timor-Leste
and is a wholly-owned subsidiary of
Estrella Resources Limited (Australia).
•
All of the Concessions and Permits are
current and in good standing.
•
The first exploration was conducted by
Allied Mining Corporation in 1937 during
which mineral potential was discovered.
Very small-scale mining of manganese,
gold and construction material was
conducted. The exploration was not
systematic and hampered by difficult
access.
•
Other work in the early 2000’s has been
conducted by the Pacific Economic
Cooperation Council -PECC Minerals
Network to assist Timor-Leste to
understand and develop its minerals
potential.
•
Local geologists and companies have
sporadically explored the area however
there has been no documentation
collected nor systematic exploration to
quantify mineral occurrences.
•
No minerals drilling has taken place.
•
No close-spaced geophysics has taken
place.
•
No systematic, modern exploration has
taken place.
•
The Geological Institute of Timor-Leste
(IGTL) has recently (and still is)
conducting stratigraphic analysis and
fossil dating to reconstruct the geological
history of Timor-Leste.
•
The current Concessions and Permits
host three main forms of manganese
mineralisation.
•
Primary mineralisation can be found in
stratigraphic banded cherts and banded
irons formed from direct precipitation of
manganese onto the sea floor. Evidence
for both microbial and inorganic
Criteria
JORC Code explanation
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These
relationships
are
particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
Reporting
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported. These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
Commentary
processes exist.
•
Secondary mineralisation exists as a
supergene blanket above the cherts
where they have been exposed to
chemical weathering.
•
Tertiary mineralisation exists where high
rainfall and erosion has sorted and
concentrated detrital manganese into
river paleo-channels or scree deposits.
•
Alluvial gold mineralisation has been
reported in the area however no
exploration has been undertaken.
•
Estrella will use and expand upon the
current known stratigraphy to evaluate
and document mineralisation styles and
relate them back to the tectonostratigraphic genesis of the area.
• Diamond drilling has been undertaken
utilising HQ and PQ triple tube.
• Sample locations are shown in the body of
the text.
•
•
•
Exploration results with all relevant
drillhole information are reported in the
body of the text.
No aggregation methods have been used.
Metal equivalent values have not been
used.
•
Any relationships have been discussed
within the body of the text.
•
Relevant diagrams have been included
within the main body of text.
•
No new information has been withheld.
Criteria
Other
substantive
exploration
data
Further work
JORC Code explanation
other locations used in Mineral Resource
estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples - size and
method of treatment; metallurgical test
results;
bulk
density,
groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large- scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Commentary
•
All observations are discussed within the
body of the text.
•
Further work by ESR will include
trenching and mapping
Additional work on specific areas will be
included under the heading Next Steps in
the body of the text when appropriate to
do so.
•
Share your feedback
Discover