Massive Sulphide Intersections Continue at Carr Boyd
Released
Released
Announcement PDF
9 July 2021
ASX ANNOUNCEMENT
MASSIVE SULPHIDE INTERSECTIONS CONTINUE AT CARR BOYD
Phase 3 Assays Reveals a Broad Mineralised Zone at T5
HIGHLIGHTS
CBDD054A returned 26.3m @ 0.73% Ni & 0.44% Cu, 1.84g/t Ag & 0.46g/t Pt + Pd (Table 1)
o Including 1.15m @ 1.47% Ni & 1.02% Cu, 4.70g/t Ag & 1.97g/t Pt + Pd
o Including 2.71m @ 1.10% Ni & 0.65% Cu, 3.16g/t Ag & 1.03g/t Pt + Pd
CBDD055B intersects 16.13m1 mineralised zone of massive, breccia and globular sulphides
(Figure 1 & Table 4)
CBDD055A intersects 28.28m1 mineralised zone of semi-massive, breccia, globular and
disseminated sulphides (Table 3)
CBDD050, CBDD050A, CBDD055 & CBDD055A assay results pending while CBDD055B is
currently being logged & sampled
Figure 1: Massive to globular nickel-copper-iron sulphides in diamond drill hole CBDD055B at 407m to 418m.
1 Downhole lengths are reported, true widths are approximately one half of downhole length. Nickel and copper tenor within the
feeder zone is variable. Intersections are reported above a 1% visual nickel-copper-iron sulphide cut-off.
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Estrella Resources Limited (ASX: ESR) (Estrella or the Company) is pleased to announce the receipt of
assays for hole CBDD054A and another two significant sulphide intersections at its 100% owned Carr Boyd
Nickel Project 80km north northeast of Kalgoorlie.
CBDD054A Assays Reveal a Broad Mineralised Zone
Assays received for diamond drillhole CBDD054A returned a significant width of nickel-copper
mineralisation. The drillhole intersected 26.3m (12.6m true width) @ 0.73% Ni & 0.44% Cu, 1.84g/t Ag &
0.46g/t Pt + Pd including several higher-grade massive breccia sulphide zones with significant platinum
group elements (PGE) results. Phase 3 significant intersections are presented in Table 1 with hole
CBDD054A highlighted in red.
There are currently four drillholes with laboratory results pending. These are due within the next two weeks.
The latest hole to be completed, CBDD055B, is currently being logged and sampled.
CBDD048
m
From
381.5
388.4
including
382.5
383.14
Hole
m To
Ni%
Cu%
Co%
6.9
True
Width
3.3
0.54
0.26
0.03
2PGE
**
0.41
0.64
0.3
1.52
0.21
0.08
0.95
1.35
Interval
Ag g/t
1.10
and
385.85
386.2
0.35
0.2
1.32
0.36
0.06
0.61
2.10
CBDD049A
386.67
393.58
6.91
3.3
0.75
0.54
0.04
0.48
2.39
including
388.49
390.36
1.87
0.9
1.74
0.54
0.08
0.90
2.60
CBDD049B
NSA - Faulted upper T5 contact
CBDD049C
372.67
375.96
3.29
1.6
0.75
0.53
0.04
0.58
2.35
including
372.67
373.27
0.6
0.3
1.19
1.07
0.06
0.72
5.23
CBDD050
Awaiting Results
CBDD050A
Awaiting Results
CBDD051
Planned Regional Hole
CBDD052
Planned Regional Hole
CBDD053
247.7
248
0.3
0.10
1.50
0.01
0.01
10.67
CBDD053
438.06
446.29
8.23
4.0
0.69
0.32
0.03
0.45
1.34
including
441.11
443
1.89
0.9
1.40
0.34
0.07
0.59
1.49
CBDD053A
426
428
2
1.0
0.46
1.43
0.02
0.52
6.50
CBDD053B
421.81
426.64
4.83
2.3
0.63
0.50
0.03
0.47
2.58
including
422.63
423.05
0.42
0.2
1.14
0.62
0.05
0.92
4.30
and
425.79
426.64
0.85
0.4
1.14
0.47
0.05
0.72
2.52
CBDD054
392.3
405.71
13.41
6.4
1.31
0.44
0.06
0.46
1.93
including
394.85
401.11
6.26
3.0
2.08
0.63
0.09
0.67
2.78
with
397.87
398.98
1.11
0.5
3.92
0.16
0.17
0.59
0.80
CBDD054A
361.21
387.54
26.33
12.6
0.73
0.44
0.04
0.70
1.84
including
361.21
362.27
1.06
0.5
1.03
0.55
0.06
0.47
2.00
and
364.41
365.56
1.15
0.6
1.47
1.02
0.08
1.97
4.70
and
376.34
379.05
2.71
1.3
1.10
0.65
0.06
1.03
3.16
CBDD054B
357
382.32
25.32
12.2
0.79
0.58
0.04
0.58
1.92
including
358.6
363.56
4.96
2.4
1.15
0.71
0.06
1.13
2.45
and
368.33
376.11
7.78
3.7
1.14
0.93
0.05
0.72
3.14
with
368.33
368.63
0.3
0.1
3.49
0.08
0.15
0.89
<0.5
CBDD055
Awaiting Results
CBDD055A
Awaiting Results
CBDD055B
To be logged and sampled
** 2PGE refers to Pt + Pd in g/t
Table 1: Phase 3 Significant Intersection Table
2.30 g/t Au
CBDD055A and CBDD055B Intersection Details
Both wedge holes CBDD055A and CBDD055B have intersected a broad zone of nickel-copper-iron
sulphide mineralisation with several massive and semi-massive sulphide zones on and above the basal
contact (Tables 3 & 4). The area targeted by these holes is the central to top portion of the Upper T5
Conductor. The strong mineralisation revealed by the drilling appears to confirm the south plunge of the
Upper T5 Conductor (Figure 2).
Examination of the core from the Phase 3 drilling has shown that there is the strong possibility that the T5
Conductor is one of several south-plunging targets along the surface of the T5 Basal Contact. The flow of
the host pyroxenite appears to have been sufficient to allow for the accumulation and redeposition of
massive sulphides perpendicular to the flow direction. These “banks” of deposited sulphides appear to be
connected within a halo of blebby to globular sulphides.
Just two of these “banks” have been drilled (the Upper and Lower T5 Conductors) in what seems to be
quite a small area with respect to the prospective surface of the T5 Basal Contact.
Estrella Managing Director Chris Daws commented:
“We have continued to hit mineralisation with a very high success rate at our 100% owned Carr Boyd nickelcopper sulphide project. Our belief is firming that the source of the Carr Boyd sulphides will be located. You
simply don’t see the quantity and nature of sulphides that we are currently drilling and what is located at
the historic Carr Boyd Ni-Cu mine without it first forming elsewhere. We are very well funded to conduct the
exploration program from here which will be a very exciting time for the Company and its shareholders.”
Next Steps
Current drilling is targeting an area just south of the Carr Boyd Rocks Mine to test the T5 Basal Contact in
relation to several high-reflectance targets generated from the recent seismic program and to help constrain
the seismic interpretation in this area. The drillhole CBDD052 will serve as a Downhole Electromagnetic
(DHEM) platform to test for northern extensions of the Carr Boyd Rocks mineralisation as well as an
extension to the T5 Conductor mineralisation on the basal contact.
Upon completion, the rig will return to the northern T5 contact to begin a series of RC pre-collars to test the
down-plunge extensions of the Upper T5 Conductor as well as an RC campaign targeting some 3.5km of
potential north of the current drill area (Figure 3).
Figure 2: 3D rendering of the T5 Basal Contact showing CBDD055A in relation to the suspected south plunge line of massive sulphide mineralisation.
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Figure 3: The T5 Basal Contact and the locations of Phase 3 RC pre-collars and Phase 4 RC drilling with respect to the size
of the T5 Pyroxenite. The Company believes that the entire T5 basal surface is prospective for massive nickel
sulphides.
The Board has authorised for this announcement to be released to the ASX.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Managing Director
Estrella Resources Limited
+61 8 9481 0389
info@estrellaresources.com.au
Media:
David Tasker
Managing Director
Chapter One Advisors
E: dtasker@chapteroneadvisors.com.au
T: +61 433 112 936
Competent Person Statement
The information in this announcement relating to Exploration Results is based on information compiled by Steve Warriner,
who is the Exploration Manager of Estrella Resources, and a member of The Australasian Institute of Geoscientists. Mr.
Warriner has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to
the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr. Warriner consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
_________________________________________________________________________________
Office Address London House, Level 11, 216 St Georges Terrace, PERTH WA 6000 Postal Address GPO Box 2517, PERTH WA 6831
Phone +61 8 9481 0389 Fax +61 8 9463 6103
Email info@estrellaresources.com.au
Table 2: Drill hole collar details for CBDD055A and CBDD055B
Hole ID
Final
Depth
Easting
Northing
RL
Dip
Azi
Status
CBDD055A
CBDD055B
412
442
367392
367392
6673656
6673656
429.7
429.7
-65
-69
272
270
Completed
Completed
Table 3: CBDD055A Visual Estimation of Sulphide Percentages
Hole ID
CBDD055A
m
From
m To
Interval
Sulphide Texture
Visual
Sulphide
Estimation
Visual
Pentlandite
Estimation
Visual
Chalcopyrite
Estimation
355.93
356.38
0.45
Semi Massive
50%
5%
5%
356.38
356.55
0.17
Dolerite Dyke
5%
Tr%
356.55
362.60
6.05
Matrix to Globular
35%
5%
362.60
363.72
1.12
Disseminated
5%
1%
363.72
367.08
3.36
Matrix to Globular
25%
3.0%
367.08
368.19
1.11
Disseminated
5%
1%
368.19
372.64
4.45
Globular
20%
3%
372.64
376.90
4.26
Dolerite Dyke
5%
Tr%
376.90
378.21
1.31
Disseminated
5%
1%
378.21
378.93
0.72
Massive Breccia
70%
7%
378.93
384.21
5.28
Stringer
10%
2%
3%
3%
4%
2%
Table 4: CBDD055B Visual Estimation of Sulphide Percentages
Hole ID
CBDD055B
m
From
m To
Interval
Sulphide Texture
Visual
Sulphide
Estimation
Visual
Pentlandite
Estimation
Visual
Chalcopyrite
Estimation
360.82
370.40
9.58
Globular
20%
2%
3%
406.35
408.29
1.94
Blebby
8%
1%
1%
408.29
410.56
2.27
Massive to Globular
55%
3%
6%
410.56
411.60
1.04
Globular
30%
1%
2%
411.60
413.78
2.18
Massive to Globular
70%
5%
2%
413.78
419.47
5.69
Globular to Disseminated
20%
2%
1%
419.47
419.78
0.31
Massive Breccia
45%
5%
2%
419.78
421.33
1.55
Basalt with Stringers
1%
421.33
421.71
0.38
Massive Breccia
25%
3%
2%
421.71
422.14
0.43
Basalt
422.14
422.48
0.34
Massive Breccia
65%
5%
2%
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of sulphide abundance should
never be considered a proxy or substitute for laboratory analysis. Laboratory assay results are required to determine the widths
and grade of mineralisation. The Company will update the market when laboratory analytical results become available.
Table 5: Assay Results for CBDD054A
Hole_ID
SampleID
M
From
M To
Interval
Ni%
Cu%
Co
ppm
Ag g/t
MgO%
Pt
g/t
Pd
g/t
S%
SG
CBDD054A
ECB11174
352
354
2
0.06
0.01
63
X
18.44
0.02
0.01
0.05
2.93
CBDD054A
ECB11175
354
356
2
0.06
0.01
61
X
18.38
0.01
0.01
0.03
3.00
CBDD054A
ECB11176
356
357.3
1.3
0.13
0.05
98
X
18.11
0.05
0.12
0.62
3.05
CBDD054A
ECB11177
357.3
358.6
1.3
0.10
0.01
83
X
21.10
0.03
0.03
0.19
3.05
CBDD054A
ECB11178
358.6
360.45
1.85
0.19
0.09
123
2.70
22.74
0.07
0.10
1.03
3.06
CBDD054A
ECB11179
360.45
361.21
0.76
0.26
0.19
153
0.70
22.23
0.12
0.16
2.13
3.09
CBDD054A
ECB11180
361.21
362.27
1.06
1.03
0.55
555
2.00
19.29
0.45
0.02
9.51
3.28
CBDD054A
ECB11181
362.27
363.32
1.05
0.75
0.99
408
4.20
18.43
0.30
0.11
7.23
3.25
CBDD054A
ECB11182
363.32
364.41
1.09
0.04
0.02
50
X
9.55
0.02
0.09
0.22
2.99
CBDD054A
ECB11183
364.41
365.56
1.15
1.47
1.02
785
4.70
12.83
0.48
1.49
13.38
3.51
CBDD054A
ECB11184
365.56
365.91
0.35
1.00
1.27
528
4.80
15.24
0.32
0.77
9.55
3.38
CBDD054A
ECB11185
365.91
366.21
0.3
0.27
0.53
148
2.20
5.72
0.08
1.03
2.47
3.03
CBDD054A
ECB11186
366.21
366.87
0.66
0.80
0.44
434
1.90
15.94
0.26
0.41
7.06
3.31
CBDD054A
ECB11187
366.87
367.17
0.3
0.52
0.53
284
2.10
11.36
0.17
2.34
4.77
3.18
CBDD054A
ECB11188
367.17
367.92
0.75
0.79
0.56
429
2.50
16.21
0.28
0.59
7.04
3.31
CBDD054A
ECB11189
367.92
369.3
1.38
0.29
0.24
165
0.90
17.38
0.14
0.28
2.16
3.14
CBDD054A
ECB11190
369.3
370.96
1.66
0.88
0.50
457
2.00
14.63
0.36
0.39
7.89
3.33
CBDD054A
ECB11191
370.96
372.8
1.84
1.02
0.34
526
1.10
15.04
0.41
0.45
8.87
3.38
CBDD054A
ECB11192
372.8
374.39
1.59
0.86
0.38
441
1.30
14.97
0.43
0.30
7.49
3.32
CBDD054A
ECB11193
374.39
375.98
1.59
0.75
0.41
387
1.30
15.13
0.44
0.41
6.13
3.28
CBDD054A
ECB11194
375.98
376.34
0.36
0.85
0.10
440
X
14.37
0.40
0.89
7.13
3.28
CBDD054A
ECB11195
376.34
376.67
0.33
1.62
0.42
865
2.80
11.77
0.69
1.89
13.44
3.56
CBDD054A
ECB11196
376.67
377.47
0.8
0.58
0.98
308
3.90
16.80
0.31
0.33
5.54
3.25
CBDD054A
ECB11197
377.47
377.78
0.31
1.44
0.90
766
5.60
12.91
0.69
0.35
12.69
3.52
CBDD054A
ECB11198
377.78
379.05
1.27
1.18
0.46
612
2.20
11.72
0.60
0.25
11.29
3.40
CBDD054A
ECB11199
379.05
381.05
2
0.28
0.22
159
1.00
10.37
0.18
0.11
2.34
3.04
CBDD054A
ECB11200
381.05
383.03
1.98
0.73
0.24
376
1.00
11.18
0.51
0.10
6.45
3.21
CBDD054A
ECB11201
383.03
383.43
0.4
1.19
0.66
631
3.90
10.96
0.37
0.20
12.05
3.40
CBDD054A
ECB11202
383.43
384.44
1.01
0.18
0.10
128
X
13.48
0.06
0.02
1.60
2.99
CBDD054A
ECB11203
384.44
385.67
1.23
0.32
0.36
175
1.40
13.53
0.16
0.11
2.81
3.09
CBDD054A
ECB11204
385.67
386.38
0.71
0.74
0.29
377
1.20
11.10
0.33
0.25
6.18
3.20
CBDD054A
ECB11205
386.38
387.15
0.77
0.24
0.31
137
1.60
8.39
0.08
0.10
2.13
2.99
CBDD054A
ECB11206
387.15
387.54
0.39
0.31
0.43
175
1.90
12.54
0.13
0.05
2.88
3.12
CBDD054A
ECB11207
387.54
389
1.46
0.26
0.18
154
0.80
9.04
0.12
0.03
2.19
3.05
CBDD054A
ECB11208
389
390.4
1.4
0.12
0.07
94
X
7.56
0.06
0.05
1.07
3.06
CBDD054A
ECB11209
390.4
392.04
1.64
0.02
0.03
56
X
8.14
0.02
0.02
0.17
3.05
CBDD054A
ECB11210
392.04
394.04
2
0.02
0.02
53
X
8.21
0.02
0.03
0.14
3.05
CBDD054A
ECB11211
394.04
396.04
2
0.01
0.02
55
X
7.60
0.02
0.02
0.12
3.05
CBDD054A
ECB11212
396.04
398.04
2
0.01
0.01
50
X
7.62
0.01
0.01
0.07
3.06
CBDD054A
ECB11213
398.04
400.04
2
0.01
0.03
55
X
6.67
0.02
0.02
0.16
3.04
APPENDIX 1 JORC TABLE 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
Nature and quality of sampling (e.g. cut DD core samples have been half cut with an automatic
techniques
channels, random chips, or specific
core saw.
specialised
industry
standard 0.25m-1.1m samples are collected from the core trays as
measurement tools appropriate to the
marked out by the supervising geologist.
minerals under investigation, such as A handheld XRF tool was used to verify the mineralisation
down hole gamma sondes or handheld
with samples reporting >0.3% Ni in disseminated zones
XRF
instruments,
etc.).
These
and >1% Ni in the matrix sulphide zones.
examples should not be taken as XRF results have not been reported and are used as a
limiting the broad meaning of sampling.
logging/sampling verification tool only.
Include reference to measures taken to
ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
Core is cut and sampled to ensure the sample is
representative and no bias is introduced. Cutting of
specific, banded or stringer sulphide zoned core is done
orthogonal to the banding to ensure there is no bias.
Aspects of the determination of
mineralisation that are material to the
Public Report.
Determination of mineralisation has been based on
geological logging, visual sulphide estimates and
confirmation using a pXRF machine. Samples were
dispatched to an accredited laboratory for multi-element
analysis.
.
Diamond core drilling was used to obtain 3m length
samples from the core barrel which are then marked in
one meter intervals, based on core block measurements.
Samples are selected based on geological logging
boundaries or on nominal meter marks.
Collected samples weigh a nominal 2-3 kg (depending on
sample length).
Samples have been dispatched to an accredited
commercial laboratory in Perth for analysis.
Samples are being analysed using a 4-acid digest, MEICP for 33 elements and ore zone samples are also being
tested for Au & PGE elements using ICP analysis.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information
Drilling
techniques
Drill sample
recovery
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
Drilling was undertaken using NQ2 sized drill core.
Holes have been collared with mud rotary from surface,
HQ rough cored to top of fresh rock then NQ2 cored to
EOH.
Core recovery was recorded by the field crew and verified
by the geologist.
RQD measurements were digitally recorded to ensure
recovery details were captured.
Sample recovery in all mineralised zones is high with
negligible core loss observed.
Diamond core drilling is the highest standard and no
relationship has been established between sample
recovery and reported grade as the core is in very good
condition.
_________________________________________________________________________________
Criteria
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
JORC Code explanation
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
Commentary
Detailed industry standard of collecting core in core trays,
marking meter intervals & drawing core orientation lines
was undertaken.
Core trays were photographed wet and dry prior to
sampling.
Drill hole logs are recorded in Excel spread sheets and
validated in Micromine Software as the drilling
progresses.
The entire length of all holes is logged.
The
verification
of
significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Results verified internally by Company personnel
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Core is half cut using an automatic core saw to achieve a
half-core sample for laboratory submission.
The sample preparation technique is considered industry
best standard practice.
No field duplicates have been collected in this program.
Field duplicates will be collected once initial results are
returned and resampling of the mineralised zones is
warranted.
Sample sizes are appropriate to the grain size of the
mineralisation.
No handheld XRF results are reported however the tool
was used to verify the mineralisation with reporting >0.3%
Ni in disseminated zones and >1% Ni in the matrix
sulphide zones.
DHTEM parameters are as follows;
Tx Loop size:
500 x 800 m
Transmitter:
GAP HPTX-70
Receiver:
EMIT SMARTem24
Sensor:
EMIT DigiAtlantis
Station spacing: 2m to 10m
Tx Freq:
0.5 Hz
Duty cycle:
50%
Current:
~130 Amp
Stacks:
32-64
Readings:
2-3 repeatable readings per
station
Hole CBDD0028 is twinning hole CBP042. No other
twinning is warranted at this stage.
The data was collected and logged using Excel
spreadsheets and validated using Micromine Software.
The data will be loaded into an externally hosted and
managed database.
No adjustments have been made to the assay data other
than length weighted averaging.
Criteria
Location of
data points
JORC Code explanation
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data
spacing
and
distribution
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s)
and
classifications
applied.
Whether sample compositing has been
applied
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
The results of any audits or reviews of
sampling techniques and data.
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
Commentary
The holes were pegged using a hand-held GPS + 3m
The rig was setup over the nominated hole position and
final GPS pickup occurred at the completion of the hole.
Holes are progressively surveyed by DGPS on a batch
basis.
MGA94_51
Topography is relatively flat and control is more than
adequate given the early stage of the project. A 3D drone
ortho-photographic survey had been used to create a
DTM of the project area.
Refer to Cross Sections and Plans included
Not applicable, no Mineral Resource is being stated.
No compositing has been applied. Intercepts are quoted
as length weighted intervals.
The drill hole orientation does not introduce a sample
bias.
Samples are in the possession of Estrella’s personnel
from field collection to laboratory submission.
No audits or reviews have been conducted for this release
given the early stage of the project.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
Type, reference name/number,
Carr Boyd Nickel Pty Ltd (a wholly owned subsidiary of
tenement and
location and ownership including
ESR) holds a 100% interest in the nickel and base metal
land tenure
agreements or material issues with
rights to the project.
status
third parties such as joint ventures,
There are no known impediments to operate in the area.
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
Exploration
Acknowledgment and appraisal of
The Carr Boyd Rocks deposit was discovered by Great
done by other
exploration by other parties.
Boulder Mines, in a joint venture with North Kalgurli Ltd
parties
in 1968. The deposit was mined between 1972 and
1975, during which time they explored for additional
breccia pipe occurrences near the mine.
WMC acquired Great Boulder Mines Ltd in 1975, briefly
reopening the mine in 1977 before closing it permanently
shortly thereafter due to a collapse in the nickel price.
The mine had produced 210,000t at 1.44% Ni and 0.46%
Cu before its closure.
From 1968 Pacminex Pty Ltd held most of the ground
over the CBLC outside of the immediate mine area.
Between 1968 and 1971 they conducted extensive
exploration programs searching for large basal contact
and/or stratabound Ni-Cu deposits. It was during this
time that most of the disseminated and cloud sulphide
occurrences such as those at Tregurtha, West Tregurtha
and Gossan Hill were discovered.
Defiance Mining acquired the regional tenements from
Pacminex in 1987 and focused on exploration for PGE
deposits between 1987 and 1990. In 1990 Defiance
purchased the Carr Boyd Rocks mine from WMC and
switched focus to the mine area between 1990 and 2001,
leaving many PGE targets untested.
From 1990 Defiance dewatered the mine to conduct
testwork and feasibility studies on the remnant
mineralisation. Metallurgical testwork, Mineral Resource
estimations, and scoping studies were completed.
Around 1996 the focus shifted again to regional
exploration for large tonnage basal contact deposits.
In 2001 Titan Resources Ltd (Titan) acquired the project
and recommenced economic evaluations of the remnant
material at Carr Boyd Rocks before embarking on
another regional exploration program focusing on the
basal contact. An aeromagnetic survey, airborne EM
reprocessing, and several programs of RAB and RC
drilling were completed.
From 2005 Yilgarn Mining entered a JV with Titan and
continued with some regional exploration, but focused
most attention in and around the Carr Boyd Rocks mine.
In 2007 Titan was acquired by Consolidated Minerals Ltd
(Consmin). Consmin conducted IP surveys and detailed
gravity surveys, but did not drill any targets before selling
the project to Salt Lake Mining (SLM) in 2013. SLM
completed limited drilling to meet expenditure
Criteria
JORC Code explanation
Commentary
commitments, before selling the project to Apollo
Phoenix Resources in 2016.
Apollo sold the project to ESR in 2018.
Geology
Deposit type, geological setting and
style of mineralisation.
The Carr Boyd project lies within the Achaean Yilgarn
Craton in a 700km belt of elongate deformed and folded
mafic, ultramafic rocks and volcanic sediments intruded
by granitoids which is referred to as the NorsemanWiluna Belt. The belt has been divided into several
geological distinct terranes, with the project area lying at
the northern end of the Gindalbie terrane (Swager, 1996).
The geology of the Carr Boyd area is dominated by the
Carr Boyd mafic-ultramafic intrusive complex (CBIC).
Several distinctive styles of Ni and Ni-Cu mineralisation
have been identified within the CBIC. At the Carr Boyd
Rocks Nickel Mine Ni-Cu mineralisation is hosted within
several 20 - 60m diameter brecciated pipe-like bodies
that appear to be discordant to the magmatic
stratigraphy. Mineralisation is hosted by a matrix of
sulphides
(pyrrhotite,
pentlandite,
pyrite
and
chalcopyrite) within brecciated Bronzite and altered
country rock clasts.
Stratiform Ni-Cu-PGE mineralisation has been identified
at several different locations within the layered magmatic
complex.
Estrella is in the process of re-mapping and reclassifying
the Carr Boyd Igneous Complex. Previous “Layered
Intrusive” models are misleading as the complex is made
up of many overprinted and juxtaposed, smaller layered
and non-layered intrusives that have progressed from
Ultramafic to Mafic over time. The complex is better
described as a magma feeder zone, where the earliest
melts passing through the Morelands Formation have
assimilated graphitic sulphidic shales, reached sulphur
saturation and deposited nickel sulphides along basal
contacts.
These basal contacts are not restricted to the base of the
complex, but can form within the complex, wherever
access was gained by these earlier flows.
The complex has then been intruded and inflated over
time by progressively more mafic, barren magmas to
produce what we see today.
Drill hole
Information
A summary of all information
material to the understanding of the
exploration results including a
tabulation
of
the
followin
Share your feedback
Discover