Quarterly Activities Report
Released
Released
Announcement PDF
QUARTERLY ACTIVITIES
REPORT
Estrella Resources Limited
Quarter ending 31 December 2018
ABN 39 151 155 207
ASX RELEASE 31 January 2019
HIGHLIGHTS
ASX Code: ESR
High Powered Electro-Magnetics (HPEM) identified two conductors at
Carr Boyd
Board and Management
Chief Executive Officer
Christopher Daws (CEO)
Non-Executive Directors
John Kingswood
Ray Shorrocks
Stephen Brockhurst
Fosters Hill Prospect 8km East of the Carr Boyd mine HPEM completed
Phase III HPEM completed extends survey another 2.6km north to the
Granites Prospect following the highly encouraging results of Phase II
Drilling at Spargoville Nickel Project returned very high-grade nickel
mineralisation
Results included
Company Secretary
David McEntaggart
Address
Level 11, London House
216 St Georges Terrace Perth
WA 6000
PO Box 2517 Perth WA 6831
Telephone: +61 8 9481 0389
Facsimile: +61 8 9463 6103
info@estrellaresources.com.au
www.estrellaresources.com.au
15m at 10.45% Ni, 0.78% Cu, 0.20% Co, 0.87g/t Pd, and 1.15g/t Pt
from 20m in KWC0004
5m at 11.32% Ni, 0.54% Cu, 0.21% Co, 0.42g/t Pd, and 0.22g/t Pt from
61m in KWC0001
3m at 12.90% Ni, 1.37% Cu, 0.29% Co, 1.86g/t Pd, and 0.67g/t Pt from
69m in KWC0002
Nickel samples from the 5A drilling collected to conduct metallurgical
test work
The drilling results, which exceeded expectations, will be used in a
Mineral Resource estimate to JORC 2012 reporting standards for the
Spargoville Nickel Project
Estrella Resources Limited (ASX: ESR) (Estrella or Company) is pleased to provide its Activities Report
for the quarter ended 31 December 2018.
WORK SUMMARY
The focus of fieldwork during the quarter was the Carr Boyd Layered Complex (CBLC), and the
Spargoville Nickel Project.
At Carr Boyd, Phase III ground HPEM surveying over the northern CBLC and the Fosters Hill area was
completed.
At Spargoville, drilling was completed on two high priority drill targets. One was sampling the highgrade mineralisation beneath the 5A open pit for metallurgical testwork and economic evaluations. The
other was an EM target located between the 5A and 5B mines. Both objectives were successfully
completed.
GROUND HPEM SURVEYING AT CARR BOYD
Phase II and Phase III moving loop HPEM surveys extending north from the Phase I survey were
completed during the quarter, screening the interpreted basal contact position and immediate footwall
sequence to over 4km north of the Carr Boyd Mine.
There are several historic high priority exploration targets and prospects in this area based on surface
geochemistry, downhole geochemistry, aero-magnetics, ground gravity, and interpreted geology
datasets. HPEM has now defined two significant conductors indicative of the presence of welldeveloped sulphides associated with two of the exploration targets, Target A and Target 5.
The Fosters Hill survey was also completed as part of the Phase II program.
Figure 1. Geological map of the CBLC with outlines of Phase I, Phase II, and Phase III HPEM. Also shown are all ranked
exploration targets (yellow dots) and advanced prospect locations (red dots).
TARGET 5
The first known report of this target appears in an internal company report written for Titan Resources
in 2004. It is described again in an internal company report written for Yilgarn Mining in 2008.
The target is defined by a 450m long zone of highly anomalous nickel and copper mineralisation in
drilling, located approximately 100m south of the newly defined EM conductor. The mineralisation and
EM conductor appear to be located on or very close to the interpreted basal contact position of the
CBLC. Historic drilling does not appear to have tested the conductor defined by the recently completed
Phase II HPEM.
Figure 2. Geological map showing the location of the T5 EM conductor, The T5 geochemical halo and nickel sulphide
location, drillhole collar locations, and distance to the Carr Boyd Mine.
The EM conductor is discrete and moderately to highly conductive. The modelled conductance is 3000
– 5000S, making this a very high priority drill target.
Historic drilling returned many anomalous results over a 450m strike length of the interpreted basal
contact at Target 5. The best of which was 3.35m at 0.79% Ni and 0.35% Cu, including 0.61m at
2.12% Ni and 0.56% Cu from 100.89m in GD124.* This occurs in a zone of disseminated and matrix
sulphide on the interpreted basal contact of the CBLC. This is very positive support for the EM
conductor located approximately 300m along strike to the north.
Figure 3. Key cross section through Target 5 showing the location of nickel sulphide intercepts.
*Refer to ESR announcement “EM Confirms Two High Priority Targets at Carr Boyd” 26 November 2018
Figure 4. Long section of Target 5 showing drillhole pierce points coloured by nickel grade, the EM model, and a
bouger gravity inversion model located at depth.
Table 1. Summary of drillholes and significant intercepts at Target 5. Intercepts have been generated on a trigger value
of 0.25% Ni, a minimum width of 0.5m, maximum total waste 15m, maximum consecutive length of waste 5m, maximum
gap 3m*
Hole_ID
Hole_Type
Easting
Northing
RL
Dip
Azimuth
EOH Depth
mFrom
mTo
Interval
Ni ppm
Cu ppm
Co ppm
GD077
CORE
367214
6673376
430
-60
270
205.74
100.58
103.63
3.05
3140
1805
140
GD077
CORE
367160
6673376
333
-60
270
206
108.81
113.08
4.27
4014
2479
129
GD077
CORE
367150
6673376
314
-60
270
206
131.98
133.81
1.83
3167
3858
167
GD089
CORE
367247
6673378
430
-60
270
192
138.99
139.6
0.61
2600
1200
100
GD089
CORE
367175
6673378
305
-60
270
192
143.87
144.48
0.61
3200
1200
100
GD089
CORE
367158
6673378
275
-60
270
192
178
179.83
1.83
2633
2133
93
GD119
CORE
367218
6673501
425
-60
270
165
97.23
97.84
0.61
13700
700
800
GD120
CORE
367154
6673712
434
-60
270
67
39.62
45.72
6.1
2700
2275
176
GD121
CORE
367168
6673712
434
-60
270
93
79.86
81.08
1.22
2850
3100
150
GD122
CORE
367153
6673695
434
-60
270
51
41.76
44.2
2.44
6900
2231
625
GD124
CORE
367221
6673531
432
-60
270
116
99.67
103.02
3.35
7952
3530
546
GD124
CORE
367167
6673531
339
-60
270
116
106.38
108.2
1.82
6180
2491
435
GD128
CORE
367253
6673532
431
-60
270
191
128.63
129.24
0.61
6400
1225
100
GD134
CORE
367253
6673503
431
-60
270
210
170.08
176.17
6.09
2592
1430
141
GD137
CORE
367254
6673473
425
-60
270
188
168.55
173.43
4.88
5363
2916
200
GD139
CORE
367219
6673589
432
-60
270
114
73.53
74.75
1.22
2700
2625
100
GD139
CORE
367164
6673589
342
-60
270
114
104.7
105.77
1.07
5128
3004
357
GD140
CORE
367218
6673652
433
-60
270
123
115.06
117.35
2.29
11719
2390
GD162
CORE
367249
6673619
432
-60
270
182
147.52
148.13
0.61
4200
725
200
GD163
CORE
367293
6673476
430
-60
270
256
236.83
237.74
0.91
5500
6875
100
GD163
CORE
367160
6673476
228
-60
270
256
242.32
243.23
0.91
4500
4500
200
GD084
CORE
367223
6673315
430
-60
270
148
NSI
GD116
CORE
367226
6673438
431
-60
270
142
NSI
GD150
CORE
367294
6673430
430
-60
270
264
NSI
GD126
CORE
367217
6673470
431
-60
270
151
NSI
GD132
CORE
367254
6673564
431
-60
270
191
NSI
Hole_ID
Hole_Type
Easting
Northing
RL
Dip
Azimuth
EOH Depth
GD125
CORE
367199
6673713
434
-60
270
113
mFrom
mTo
Interval
NSI
Ni ppm
GD147
CORE
367196
6673778
434
-60
270
142
NSI
GD143
CORE
367225
6673837
434
-60
270
220
NSI
GD144
CORE
367222
6673899
435
-60
270
198
NSI
GD129
CORE
367223
6673562
432
-60
270
134
NSI
CBC022
RC
367613
6673407
421
-60
90
150
NSI
CBR193
RAB
367638
6673707
435
-60
90
16
NSI
CBR194
RAB
367588
6673707
435
-60
90
7
NSI
CBR195
RAB
367538
6673707
435
-60
90
18
NSI
CBR204
RAB
367638
6673402
433
-60
90
35
NSI
CBR205
RAB
367588
6673402
433
-60
90
23
NSI
CBR206
RAB
367538
6673402
433
-60
90
17
NSI
CBR207
RAB
367488
6673402
433
-60
90
21
NSI
CBR208
RAB
367438
6673402
434
-60
90
16
NSI
CBR209
RAB
367388
6673402
435
-60
90
32
NSI
CBR210
RAB
367338
6673402
435
-60
90
35
NSI
CBR218
RAB
367488
6673757
420
-60
90
27
NSI
CBR219
RAB
367438
6673757
420
-60
90
24
NSI
CBR220
RAB
367388
6673757
420
-60
90
36
NSI
CBR221
RAB
367338
6673757
420
-60
90
47
NSI
CBR222
RAB
367288
6673757
420
-60
90
46
NSI
CBR223
RAB
367238
6673757
420
-60
90
20
NSI
CBR224
RAB
367188
6673757
420
-60
90
35
NSI
CBR225
RAB
367138
6673757
420
-60
90
39
NSI
CBR226
RAB
367088
6673757
420
-60
90
32
NSI
CBR227
RAB
367038
6673757
420
-60
90
41
NSI
CBR228
RAB
366988
6673757
420
-60
90
25
NSI
CBR229
RAB
366938
6673757
420
-60
90
27
NSI
CBR230
RAB
366888
6673757
420
-60
90
37
NSI
CBR231
RAB
366838
6673757
420
-60
90
35
NSI
CBR232
RAB
366788
6673757
420
-60
90
53
NSI
GD078
DD
367443
6673327
426
-60
270
119
NSI
GD082
DD
367504
6673537
427
-60
90
166
NSI
GD141
DD
367387
6673936
431
-60
270
265
NSI
GD148
DD
366923
6673820
439
-60
270
152
NSI
Cu ppm
Co ppm
*Refer to ESR announcement “EM Confirms Two High Priority Targets at Carr Boyd” 26 November 2018
TARGET A
This is a conceptual satellite style target located on an interpreted fault outside of the CBLC, in the
footwall sequence. The target area also appears in the Titan and Yilgarn Mining reports, although the
newly defined EM conductor is located approximately 200m further west, on a different magnetic feature.
A diamond drillhole spudded by Defiance Mining in 1997, DD97CB043 appears to target the conductor
position, suggesting it was detected by a SiroTEM survey completed at that time. Interrogation of the
available datasets suggests the hole did not intersect the conductor, although more investigation is
required to confirm this.
The aim is to locate the hole collar in the field and have it picked up by a licensed surveyor. If the hole
can be re-entered and gyro surveyed that will also be completed. As geological logs are not available
for the hole, the core will be re logged and physical property tests carried out on it to determine the best
course of action for the EM target (if historic core can be located).
ABOUT THE PROJECT AND THE CBLC
The CBLC is a 75km2 layered mafic igneous complex, which hosts several occurrences of nickel and
copper sulphides. The most significant occurrence discovered to date is at the Carr Boyd Rocks mine,
where mineralisation is hosted by bronzitite breccias (pyroxenites) emplaced within the gabbroic
sequence of the Complex. The CBLC is in a Tier 1 jurisdiction approximately 80km north north-east of
Kalgoorlie Western Australia. An all-weather haul road accessible by Estrella under a granted
miscellaneous license connects the Project to the Goldfields Highway via Scotia.
A “Voisey Bay” style model has not been adequately explored within the CBLC. This represents a
compelling exploration target opportunity which the Company will continue to aggressively pursue.
SPARGOVILLE 5A TARGET
Recent drilling has exceeded the Company expectations at 5A. Assay results returned from the
Company’s maiden drilling program have been consistently higher than historic drilling. The presence
of elevated platinum group and cobalt mineralisation in the results is also a very encouraging
development for the project.
Figure 5. Cross Section section of Spargoville 5A showing the drill hole trace for RC hole KWC0002. Note historic drilling
has been left off the cross section for clarity.+
Bulk samples have been collected from the drill spoils to conduct metallurgical test work and delivered
to a laboratory in Perth, WA. There have been significant advances in metallurgical technology and
the Company is excited by the significant platinum group element grades, and the high cobalt price have
the potential to significantly enhance the economics of the project.
Recent interrogation of historic geophysical datasets has revealed the presence of several high priority
EM targets, which will be targeted by future drilling. Updates on these geophysical targets will be
provided once the interrogation process is completed.
+Refer to ESR announcement “Spectacular Maiden Drill Results Spargoville” 06 December 2018
Figure 6. Long section of Spargoville 5A showing the pierce point locations of the new RC holes, KWC0001, KWC0002,
KWC0003, and KWC0005+
+Refer to ESR announcement “Spectacular Maiden Drill Results Spargoville” 06 December 2018
Figure 7. Map showing location of the 5A open pit, and the drill collars for the intercepts reported in this announcement
M15/96-C1 TARGET
An EM survey completed by Consolidated Minerals in 2010 on neighbouring tenement M15/96 identified
this EM conductor, which was located close the eastern boundary of M15/395. KWC0003 targeted this
conductor, which was found to be caused by a sulphidic black shale horizon in ultramafics and no follow
up work will be required.
There are several historic EM targets within the Spargoville Project tenure which the Company is
currently interrogating and further updates will be provided once this is completed.
Figure 8. Plan showing the location of the 5A drill target and KWC0003, targeting the M15/96-C1 EM target
Figure 9. Cross section of the M15/96 C1 target, showing the position of the black shale horizon intersected by KWC0002.
mFro
m
61
mTo
Width
Ni %
270
EOH
Depth
90
66
5
272
90
69
72
3
-60
90
300
-60
355
46
Hole_ID
Type
Easting
Northing
RL
Dip
Azi
KWC0001
RC
357975
6530240
346
-60
KWC0002
RC
357972
6530190
348
-50
KWC0003
RC
357831
6529229
347
357935
6530233
317
KWC0004
RC
KWC0004
RC
KWC0005
RC
357932
6530223
317
-60
195
KWC0006
RC
357975
6530240
346
-45
258
KWC0006
RC
5ADD003
DD
357975
6530248
345
-54
270
83.9
5ADD010
DD
357876
6530177
346
-61
90
131.8
5ADD011
DD
357974
6530233
346
-50
270
72.3
5AM-1
UKN
357923
6530213
349
-60
90
5AM-2
UKN
357926
6530229
348
-45
5AM-3
UKN
357921
6530229
348
5AM-4
UKN
357927
6530246
5AM-5
RC
357919
5AM-7
UKN
5AM-8
Co
ppm
2054
Pd ppb
11.32
Cu
ppm
5413
423
Pt
ppb
217
12.90
13667
2876
1856
672
NSI
0
14
14
4.18
6769
846
464
266
20
35
15
10.45
7840
1972
872
31
0
5
5
1.90
1738
469
148
114
9
44
80
39
40
1
1.50
234
136
21
21
52
66
14
4.83
3002
785
286
139
68
70.97
2.97
10.53
8225
2385
315
382
110.1
112.23
2.13
1.07
765
207
181
131
66.7
71.17
4.47
8.80
5902
2010
NA
NA
32
18.45
26.25
7.8
3.01
NA
NA
NA
NA
90
26
19.75
22.6
2.85
5.67
NA
NA
NA
NA
-60
90
38
27
32.5
5.5
2.49
NA
NA
NA
NA
347
-60
90
37
25
31.2
6.2
1.84
NA
NA
NA
NA
6530262
346
-60
90
60
42.2
47.6
5.4
2.73
NA
NA
NA
NA
357897
6530203
348
-60
90
63
49
54
5
2.82
NA
NA
NA
NA
UKN
357890
6530172
348
-60
90
83
68.55
75.54
6.99
1.31
NA
NA
NA
NA
5ARC009
RC
357916
6530175
349
-60
89
28
11
19
8
2.67
1538
NA
NA
NA
5ARC010
RC
357916
6530186
349
-60
90
40
15
27
12
2.07
3758
NA
NA
NA
5ARC011
RC
357926
6530197
349
-60
92
22
8
15
7
3.56
2400
NA
NA
NA
5ARC012
RC
357916
6530198
349
-60
91
34
19
29
10
1.94
1860
NA
NA
NA
5ARC013
RC
357928
6530214
349
-60
89
28
12
18
6
2.61
2383
NA
NA
NA
5ARC014
RC
357917
6530214
349
-60
90
40
27
30
3
2.95
3067
NA
NA
NA
5ARC015
RC
357936
6530230
348
-60
91
22
11
14
3
2.67
3267
NA
NA
NA
5ARC016
RC
357935
6530246
347
-60
88
28
14
19
5
1.33
1220
NA
NA
NA
5ARC017
RC
357935
6530263
346
-60
88
34
18
22
4
1.96
1175
NA
NA
NA
5ARC018
RC
357915
6530162
349
-60
89
28
14
17
3
1.59
4900
NA
NA
NA
Easting
Northing
RL
Dip
Azi
5ARC019
Hole_Typ
e
RC
Ni %
13
Interv
al
13
Co
ppm
NA
Pd ppb
2.56
Cu
ppm
1746
NA
Pt
ppb
NA
357925
6530176
317
-90
5ARC020
RC
357925
6530202
318
-90
4
4
1.75
3175
NA
5ARC020
RC
-90
0
24
29
NA
NA
5
7.46
6320
NA
NA
5ARC021
RC
357925
6530187
317
-90
0
34
15
NA
33
18
6.65
8361
NA
NA
5ARC022
RC
357928
6530201
318
-90
0
40
NA
28
40
12
4.46
1992
NA
NA
5ARC023
RC
357929
6530214
317
-90
0
40
NA
0
6
6
1.70
2733
NA
NA
5ARC023
RC
-90
NA
0
19
23
4
2.27
1500
NA
NA
5ARC023
RC
NA
-90
0
27
40
13
5.37
3900
NA
NA
5ARC024
RC
357931
6530231
NA
318
-90
0
22
5
18
13
3.51
2569
NA
NA
5ARC025
RC
357933
NA
6530231
318
-90
0
34
1
13
12
3.76
1883
NA
NA
5ARC026
RC
NA
357935
6530247
319
-90
0
22
10
22
12
3.61
3525
NA
NA
5ARC027
NA
RC
357940
6530262
321
-90
0
22
11
16
5
2.64
1700
NA
NA
NA
5ARC028
RC
357943
6530262
321
-90
0
28
6
15
9
1.93
1544
NA
NA
NA
5ARC041
RC
357959
6530177
349
-57
270
82
58
64
6
3.35
1773
750
NA
NA
5ARC055
RC
357954
6530154
349
-49
272
52
38
46
8
1.61
2294
499
379
86
5ARC059
RC
357979
6530136
348
-63
268
106
101
103
2
1.37
864
349
410
106
5ARC060
RC
357957
6530173
349
-52
271
64
47
53
6
1.85
1390
640
424
85
P45
RC
357922
6530187
349
-60
90
30
8
17
9
2.83
NA
NA
NA
NA
P46
RC
357928
6530175
349
-90
360
30
3
6
3
1.06
NA
NA
NA
NA
P47
RC
357923
6530175
349
-90
360
33
9
15
6
4.68
NA
0
NA
NA
P47
UKN
-90
360
19.5
27
7.5
3.34
NA
NA
NA
NA
P49
RC
357935
6530202
349
-90
360
22
2
12
10
1.47
NA
NA
NA
NA
P50
RC
357927
6530203
349
-90
360
33
21
30
9
2.27
NA
NA
NA
NA
P51
RC
357933
6530213
348
-90
360
30
15
27
12
5.27
NA
NA
NA
NA
WS5140
DD
357899
6530186
349
-60
90
137
46.93
55.47
8.54
3.50
5058
NA
NA
NA
WS5143
DD
357918
6530246
348
-60
90
102
37.79
40.69
2.9
4.15
5673
NA
NA
NA
WS5150
DD
357902
6530246
348
-60
90
128
57.6
61.26
3.66
13.01
10759
NA
NA
NA
WS5154
DD
357883
6530213
348
-60
90
156
82.2
86.41
4.21
3.75
905
NA
NA
NA
WS5161
DD
357913
6530229
349
-60
90
63
39.13
43.64
4.51
2.94
1773
NA
NA
NA
WS5162
DD
357897
6530229
349
-60
90
104
56.02
62.94
6.92
4.47
3436
NA
NA
NA
WS5145
DD
357918
6530120
350
-60
90
127
60.35
61.72
1.37
5.55
1409
NA
NA
NA
WS5156
DD
357903
6530120
349
-60
90
181
84.09
84.33
0.24
7.50
1800
NA
NA
NA
5ADD008
DD
357873
6530153
347
-62
91
132
118.69
118.83
0.14
1.64
272
271
3
6
5ARC040
RC
357962
6530152
349
-60
270
64
52
53
1
1.06
234
82
NA
NA
WS5166
DD
357890
6530186
348
-60
90
112
73.67
74.15
0.48
4.71
887
NA
NA
NA
WS5221
DD
357757
6530181
350
-65
90
306
248.22
248.56
0.34
3.44
3700
NA
NA
NA
WS5226
DD
357731
6530181
351
-65
90
336
279.19
280.11
0.92
1.02
535
NA
NA
NA
5ADD004
DD
357882
6530203
346
-68
93
153
132.66
133.81
1.15
5.47
1101
695
447
371
5ADD012
DD
357791
6530233
349
-61
88
306
266.35
267.28
0.93
2.23
2273
577
59
95
5ADD013
DD
357836
6530222
347
-59
87
204
195.7
196.08
0.38
1.24
964
515
NA
NA
5ADD006
DD
357873
6530230
345
-60
90
138
114.02
114.24
0.22
1.34
4566
268
137
87
WS5147
UKN
357887
6530246
347
-65
90
160
88.23
88.36
0.13
9.40
11500
NA
NA
NA
Hole_ID
mFro
m
0
mTo
0
EOH
Depth
22
0
34
0
5AM-6
UKN
357904
6530261
346
-60
90
72
65.4
66
0.6
7.21
NA
NA
NA
NA
WS5153
UKN
357892
6530280
346
-60
90
117
83.3
84
0.7
5.89
686
NA
NA
NA
5ARC050
RC
357923
6530342
350
-60
90
40
NSI
5ARC051
RC
357906
6530341
351
-60
90
64
NSI
07BKWD
0003
5ARC049
DD
357721
6530322
353
-59
89
399
NSI
RC
357927
6530311
345
-60
90
40
NSI
5ARC048
RC
357909
6530309
347
-60
90
67
NSI
WS5209
DD
357873
6530310
349
-60
90
141
NSI
5ARC047
RC
357891
6530308
348
-60
90
100
NSI
5ARC046
RC
357967
6530284
344
-50
270
52
NSI
5ARC052
RC
357908
6530280
341
-55
90
76
NSI
WS5149
DD
357908
6530280
345
-60
90
99
NSI
5ADD007
DD
357895
6530280
341
-60
90
102
NSI
5ARC053
RC
357871
6530280
343
-60
88
142
NSI
WS5155
DD
357875
6530279
347
-60
90
137
NSI
5ARC065
RC
357889
6530260
342
-60
90
106
NSI
5ADD009
DD
357867
6530259
342
-60
91
141
NSI
WS5224
DD
357827
6530246
348
-60
90
214
NSI
5ARC054
RC
357861
6530230
345
-60
90
178
NSI
5ADD015
DD
357877
6530228
347
-55
90
117
WS5164
DD
357885
6530229
348
-60
90
152
2665
NA
NA
NA
NSI
83.39
83.88
0.49
4.90
Easting
Northing
RL
Dip
Azi
WS5088
Hole_Typ
e
DD
357865
6530212
347
-60
90
EOH
Depth
203
5ARC063
RC
357883
6530203
346
-55
91
118
NSI
5ARC064
RC
357883
6530205
346
-61
92
142
NSI
07BKWD
0004
WS5017
DD
357800
6530229
348
-57
109
279
NSI
DD
357804
6530186
349
-45
90
217
NSI
5ARC061
RC
357878
6530177
347
-57
91
130
NSI
WS5171
DD
357898
6530168
349
-60
90
109
NSI
WS5144
DD
357900
6530152
349
-60
90
151
NSI
WS5022
DD
357881
6530092
351
-45
45
198
NSI
5ARC057
RC
357972
6530136
349
-61
266
76
NSI
5ARC058
RC
357958
6530137
349
-61
268
40
NSI
5ARC056
RC
357947
6530137
349
-61
270
34
NSI
5ARC038
RC
357968
6530122
350
-55
270
52
NSI
5ARC039
RC
357950
6530122
350
-58
270
34
NSI
WS5232
DD
357856
6530121
350
-60
90
191
NSI
WS5238
DD
357719
6530119
351
-70
90
361
NSI
5ARC037
RC
357928
6530096
349
-60
90
40
NSI
5ARC029
RC
357910
6530096
349
-60
90
72
NSI
WS5176
DD
357901
6530092
350
-60
90
151
NSI
5ARC030
RC
357909
6530099
349
-74
90
102
NSI
WS5234
DD
357815
6530095
352
-65
90
249
NSI
5ARC033
RC
357907
6530067
350
-74
90
100
NSI
5ARC032
RC
357907
6530070
350
-60
90
58
NSI
PH278
UKN
357916
6530034
350
-60
90
71
NSI
5ARC035
RC
357903
6530013
350
-60
90
64
NSI
5ARC036
RC
357918
6530010
350
-60
90
40
NSI
5ARC042
RC
357887
6530013
351
-60
90
88
NSI
Hole_ID
mFro
m
mTo
Interv
al
Cu
ppm
Ni %
Co
ppm
Pd ppb
Pt
ppb
NSI
+Refer to ESR announcement “Spectacular Maiden Drill Results Spargoville” 06 December 2018
MUNDA PROJECT
With the gold price rising above A$1800 per oz the Munda gold resource is becoming a potentially
valuable asset for the Company. Efforts are currently underway to assess options to realise this
increasing value for the benefit of shareholders.
Figure 10. Cross section of Munda showing some of the thicker higher grade gold intercepts and interpreted gold
shoots.x
xRefer to ESR announcement “ESR to Acquire Munda Gold and Spargoville Nickel Projects” 04 September 2017
The Company plans to test a new “plunging shoot” structural interpretation to the high-grade gold
mineralisation. The additional drilling and assay information obtained from this work will be used to
update the current JORC2012 Mineral Resource of 511,000t @ 2.82g/t Au for 46,337 ounces Au. x
Table 2. Munda Gold Mineral Resource Estimatex
Resources
Category
Metal Grade
Contained Metal
Cut off
Tonnage
Gold
Gold
(Au g/t)
(Kt)
(g/t)
(oz)
Inferred
1
511
2.82
46,337
Total
1
511
2.82
46,337
Figure 11. Plan showing previous high-grade gold interceptsx
xRefer to ESR announcement “ESR to Acquire Munda Gold and Spargoville Nickel Projects” 04 September 2017
Figure 12. Geological map showing the location of the Munda project, exploration targets on M15/87, and other
relevant nearby landmarks.
CORPORATE
CAPITAL
The Company placed the balance of the non-renounceable options entitlement issue on the
16 November 2018 raising $91,177 in working capital. The Company’s cash balance as at 31
December 2018 was A$282,000.
During the Quarter 118,750 options exercisable at $0.080 and 750,000 options exercisable at
$1.40 expired, unexercised.
Fully Paid Ordinary Shares
491,883,292
Listed options exercisable
$0.05 on or before the 27 June 2021 – 183,961,097
Unlisted options exercisable $0.024 on or before 31 March 2020 - 8,250,000
$0.05 on or before 15 May 2021 – 5,500,000
$0.05 on or before 27 June 2021 - 17,000,000
$0.40 on or before 13 November 2019 – 1,375,000
Competent Person Statement
The information in this announcement relating to Exploration Results, Mineral Resources or Ore Reserves is based
on information compiled by Luke Marshall, who is a consultant to Estrella Resources and a member of The
Australasian Institute of Geoscientists. Mr Marshall has sufficient experience relevant to the style of mineralisation
and type of deposit under consideration, and to the activity he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and
Ore Reserves”. Mr Marshall consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
FURTHER INFORMATION CONTACT
Christopher J. Daws
Chief Executive Officer
Estrella Resources Limited
info@estrellaresources.com.au
Appendix 1 – Tenement Information as Required by Listing Rule 5.3.3.
Change
in
Holding
(%)
Current
Interest (%)
Country
Location
Project
Tenement
Australia
WA
Carr Boyd Nickel Project
E29/1012
-
100
Australia
WA
Carr Boyd Nickel Project
E29/0982
-
100
Australia
WA
Carr Boyd Nickel Project
L24/0186
-
100
Australia
WA
Carr Boyd Nickel Project
E31/0726
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1124
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0012
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0109
-
100
Australia
WA
Carr Boyd Nickel Project
M31/0159
-
100
Australia
WA
Carr Boyd Nickel Project
E31/1162
-
100
Australia
WA
Munda Nickel & Gold Project
M15/87
Australia
WA
Spargoville Nickel Project
M15/395
Australia
WA
Spargoville Nickel Project
M15/703
Australia
WA
Spargoville Nickel Project
M15/1828
Australia
WA
Spargoville Nickel Project
E15/967
Australia
WA
Spargoville Nickel Project
E15/968
Australia
WA
Spargoville Nickel Project
L15/128
Australia
WA
Spargoville Nickel Project
L15/255
*Nickel rights only - underlying tenements held by third parties.
1 Expired during the quarter
(100)* 1
(100)* 1
-
100
100*
100*
100*
100*
100*
Share your feedback